Oilcontaminated Water

  • MR Feb-24#40 Images Seaspan Corporation/Foreship
With plans to have a)
    February 2024 - Maritime Reporter and Engineering News page: 40

    Images Seaspan Corporation/Foreship With plans to have a full-scale test engine running on am- age it'll be similar to LNG.” Looking at the engine makers and monia in early 2024, the company said it expects to hold its de- their progress, Brindley is diplomatic in saying that there is no livery timeline

  • MR Feb-24#38 TECH FEATURE
Ammonia and the 15,00
A project initiated by)
    February 2024 - Maritime Reporter and Engineering News page: 38

    TECH FEATURE Ammonia and the 15,00 A project initiated by Seaspan Corporation and the Mærsk Mc-Kinney Møller Center for Zero Carbon Shipping (MMMCZCS) has set out to develop a design for a large 15,000-TEU ammonia-fueled container vessel. Image Seaspan Corporation/Foreship By Greg Trauthwein orking with

  • MR Feb-24#35 PTI/PTO
30 years ago shaft generators with PTI capability)
    February 2024 - Maritime Reporter and Engineering News page: 35

    PTI/PTO 30 years ago shaft generators with PTI capability kept container ships sailing at top speed. That purpose gone, PTI/PTO is making a new comeback in more cargo shipping segments, this time for reducing emissions. By Wendy Laursen etro? tting a shaft generator is not an insigni? - the ef? ciency

  • MR Feb-24#33 EAL  AND STERN TUBE DAMAGES
STACKING 
not forget any oil)
    February 2024 - Maritime Reporter and Engineering News page: 33

    EAL AND STERN TUBE DAMAGES STACKING not forget any oil leak, big or small, can be catastrophic to the marine environment and marine life, with some EALs found to THE DECKS be only slightly less damaging than the phased-out traditional WITH BEST-IN-CLASS MARINE oils,” said VP of Business Development

  • MR Feb-24#32 REPAIR
Photo Courtesy Marine and Industrial Transmissions
in)
    February 2024 - Maritime Reporter and Engineering News page: 32

    REPAIR Photo Courtesy Marine and Industrial Transmissions ings to optimize load distribution. A large number of the incidents analyzed by Gard were attributed to ghost ? shing gear that enter the stern tube seal area causing seawater to contaminate the lubrication oil. A 2022 study by CSIRO scientists

  • MR Feb-24#31 EAL  AND STERN TUBE DAMAGES
“Our recommendations 
“A good)
    February 2024 - Maritime Reporter and Engineering News page: 31

    EAL AND STERN TUBE DAMAGES “Our recommendations “A good bearing are simple. Please design is have good control over important.” your oil quality in the primary barrier, the aft – Øystein Åsheim Alnes sealing system,” Head of section for Propulsion and Steering, – Arun Sethumadhavan DNV

  • MR Feb-24#30 REPAIR
Photo courtesy Marine and Industrial Transmissions
ST)
    February 2024 - Maritime Reporter and Engineering News page: 30

    REPAIR Photo courtesy Marine and Industrial Transmissions STERN TUBE DAMAGE DECLINING? It might be easy to blame EALs, but the ongoing causes of stern tube damage are varied, and possibly declining. By Wendy Laursen nvironmentally Acceptable lubricants (EALs) gained market traction with the introduction

  • MR Feb-24#20 MARKETS
FPSO technology dominates the region’s FPS demand.)
    February 2024 - Maritime Reporter and Engineering News page: 20

    MARKETS FPSO technology dominates the region’s FPS demand. duction and storage of low and zero emission energy carriers, In all, 18 countries in West and East Africa are expected such as methanol and ammonia. One exciting development to receive new FPSOs, FLNGs and FPUs between 2024 and leverages

  • MR Feb-24#15 Cruise ships can be cleaned during normal passenger)
    February 2024 - Maritime Reporter and Engineering News page: 15

    Cruise ships can be cleaned during normal passenger transfer port calls. Cleanings and cargo operations can occur simul- taneously. How is this possible? The EverClean robots are small and require only a single cargo van on the pier. Multiple robots can be deployed simultaneously. Precision navigation

  • MR Feb-24#11 down to a smaller size, and especially a smaller width)
    February 2024 - Maritime Reporter and Engineering News page: 11

    down to a smaller size, and especially a smaller width relieves waterfront infrastructure footprints and costs. that issue. One may argue that one human with a bigger truck These 5-foot wide units will zip through the city much faster can deliver more cargo than one human with a smaller truck, and

  • MR Feb-24#10 Back to the Drawing Board 
Let’s Set Some Standards for)
    February 2024 - Maritime Reporter and Engineering News page: 10

    Back to the Drawing Board Let’s Set Some Standards for Micro Cargo By Rik van Hemmen s zero carbon cargo efforts are progressing, it is becoming more apparent that the lowest hanging fruit is in the last few miles. This is where a large amount of carbon is expended in delivering small A parcels to

  • MN Feb-24#41 Vessels
WINDEA Intrepid & 
WINDEA Courageous
The ?  rst)
    February 2024 - Marine News page: 41

    Vessels WINDEA Intrepid & WINDEA Courageous The ? rst two designed, BV-classed CTVs for WINDEA CTV. The third newbuild crew and fourth vessels are under construction at St Johns, and transfer vessels construction of the ? fth vessel is well underway at Breaux (CTV) for WIN- Brothers in Louisiana.

  • MN Feb-24#27 Feature
Passenger Vessel Safety
? re risk and related)
    February 2024 - Marine News page: 27

    Feature Passenger Vessel Safety ? re risk and related technical issues. Canada: Transport Canada.” In the U.S., last February, the Coast Guard issued a Another top issue, just as in the U.S. – workforce re- Marine Safety Alert: “Saltwater intrusion causes damage cruitment, which he called a “key issue for

  • MN Feb-24#26 Feature
Passenger Vessel Safety
ume is even more eye-opening)
    February 2024 - Marine News page: 26

    Feature Passenger Vessel Safety ume is even more eye-opening. The trade association In- ect seeking to signi? cantly reduce the risk of ? res on board terferry, which represents ferry operators and businesses ro-ro (roll on–roll off) ships. Corrigan said that Interferry’s worldwide, calculates that

  • MN Feb-24#24 Feature
Passenger Vessel Safety
Any upcoming meetings?)
    February 2024 - Marine News page: 24

    Feature Passenger Vessel Safety Any upcoming meetings? inspected passenger vessels in the U.S-? ag ? eet. • Of these, 530 are already required by domestic In early January, NTSB was asked about its working re- law to have SMSs, in accordance with lationship with the USCG. International Maritime

  • MN Feb-24#19 ment, work processes and technology progress, and it can)
    February 2024 - Marine News page: 19

    ment, work processes and technology progress, and it can if you start the new year out by listening to your workforce be hard to keep up with the latest changes. In 2024, keep and implementing necessary changes to work practices an eye out for updates to existing standards and implement based on their

  • MN Feb-24#17 Column
Going Green
ernize ferry operations, replace aging)
    February 2024 - Marine News page: 17

    Column Going Green ernize ferry operations, replace aging implemented to address grid and space increased power requirements. That vessels, and upgrade ferry terminals. constraints with electri? cation. can involve installing new conduit, The grants are critical to helping WETA is one of many U.S.

  • MN Feb-24#8 By the
Numbers
© Dragon Claws / Adobe Stock 
Rebuilding)
    February 2024 - Marine News page: 8

    By the Numbers © Dragon Claws / Adobe Stock Rebuilding the Foundations of US Offshore Wind By Philip Lewis, Director of Research, Intelatus Global Partners As we enter a New Year, the memories of the shocks to with a potential of 3.3-6.3 GW in Delaware and Chesa- the foundations to the U.S. offshore wind

  • MT Jan-24#60 SHOW PREVIEW OCEANOLOGY INTERNATIONAL 2024
All images)
    January 2024 - Marine Technology Reporter page: 60

    SHOW PREVIEW OCEANOLOGY INTERNATIONAL 2024 All images courtesy Oceanology International • ANB Sensors, developers of revolutionary, calibration updates on information, meeting customers, meeting poten- free pH sensors for ocean monitoring; tial suppliers, hearing what’s happening in the industry – you •

  • MT Jan-24#59 All images courtesy Oceanology International
participants)
    January 2024 - Marine Technology Reporter page: 59

    All images courtesy Oceanology International participants and to deliver another packed three days of exhi- Oi24 Events and Features bition and conference activity, features, workshops and one- Oceanology International is able to capitalize on the advan- to-one meetings.” tages of ExCeL’s expansive 18

  • MT Jan-24#58 SHOW PREVIEW OCEANOLOGY INTERNATIONAL 2024
All images)
    January 2024 - Marine Technology Reporter page: 58

    SHOW PREVIEW OCEANOLOGY INTERNATIONAL 2024 All images courtesy Oceanology International Oi 2024 ceanology International 2024 (Oi24), arguably content across ? ve different conference locations. World-class the world’s biggest and best marine science, scientists, thought leaders and innovators in the

  • MT Jan-24#57 DEEP DIVE Podcast Debuts 
In episode one of the DEEP DIVE)
    January 2024 - Marine Technology Reporter page: 57

    DEEP DIVE Podcast Debuts In episode one of the DEEP DIVE podcast, host Rhonda Moniz Meet the Host hosts Dan Shropshire, Vice President Business Development and Rhonda J. Moniz is an ac- Program Execution at Teledyne Marine Vehicles & Emily Shum- complished underwater chenia, Director - Regional Wildlife

  • MT Jan-24#56 FLOATING OFFSHORE WIND GAZELLE WIND POWER
We’re already)
    January 2024 - Marine Technology Reporter page: 56

    FLOATING OFFSHORE WIND GAZELLE WIND POWER We’re already working on the pre-FEED, and now we’re go- clude 70 turbines of 15MW each, and has preselected Gazelle ing to be working on the engineering portion. Our main goal as one of the providers for the offshore wind platform. So, is to prove the concept

  • MT Jan-24#55 Gazelle is banking on its 
modular solution, which Ortega)
    January 2024 - Marine Technology Reporter page: 55

    Gazelle is banking on its modular solution, which Ortega says should represent a 30% reduced platform cost. “We are targeting 75% less of mooring length compared. So less mooring length, less materials will be used.” Alvaro Ortega, CFO, Gazelle Wind Power All images courtesy Gazelle Offshore Wind Gaze