Chris Chuhran

  • On March 29, the Ocean Class Auxiliary General Oceanographic Research (AGOR) vessel hull number 27 started its official life as the R/V Neil Armstrong, the first research vessel named after a space explorer.  Carol Armstrong, the widow of the famed astronaut, performed the christening duties during a brief sunbreak on a windy and rainy Pacific Northwest afternoon. 
    The number of illustrious speakers highlighted the rich diversity of agencies involved in the design, construction and operation of the vessel.  Dick Nelson, President of Dakota Creek Industries (DCI), the construction shipyard, spoke first followed by Chris Chuhran, VP of Guido Perla and Associates, Inc.  (GPA), the Seattle-based Naval Architecture and Marine Engineering firm that partnered with DCI for the design and build project.  Chuhran said even though the keel was laid in June of 2012, the entire process had actually taken several years from its earliest idea phase to today’s ceremony.  The final detail design evolved over many months with frequent reviews by NAVSEA, the Office of Naval Research (ONR), the National Science Foundation (NSF) and the University National Oceanographic Laboratory System (UNOLS).  On several occasions, DCI hosted review meetings attended by more than 40 people.
    Rear Admiral Jonathan White, USN, said the R/V Neil Armstrong would help the Navy and the United States “…know the ocean better than anyone else,” much like Armstrong’s trip to the moon helped us know the lunar world. 
    Chief of Naval Research, Rear Admiral Mathew Klunder, declared it a “magnificent vessel” that was “made and designed for the future.” 
    Dr. Susan Avery, President and Director of Woods Hole Oceanographic Institution (WHOI) assured Mrs. Armstrong that her “husband’s legacy lives on in his namesake ship.”  She described the ship as a “high-tech marvel” that is expected to perform its 40-year mission with distinction.  The R/V Neil Armstrong will replace the R/V Knorr, in service since 1968, one year before Armstrong’s walk on the moon.  The R/V Knorr, AGOR-15, is retiring after logging over one million miles in service to the Navy and WHOI.
    Guests at DCI’s Transit Shed ceremony had only a short time to admire the sleek lines of the ship before tugs, taking advantage of the high tide, moved her back to the shipyard for completion of the interior systems. 
    Commissioning and finish work should be completed by August, followed by sea trials, after which the ship will then spend an additional six months in the Puget Sound area training the crews and adjusting the equipment before she heads for her new home port at WHOI in Massachusetts. 
    Initial vessel construction for the two-ship, $145-million-dollar project is funded by NAVSEA who will retain ownership of the vessel.  Scientists from WHOI and around the world will be the primary users conducting year-round research in the North Atlantic and Arctic Oceans.  WHOI will contribute $350,000 a year for maintenance and operation of the vessel.
    Dr. Avery praised the modern design and ample computer lab space available on the R/V Neil Armstrong allowing scientists to analyze collected data in real time.  She explained that the National Science Foundation (NSF) handles the complicated process of coordinating and scheduling research time on the ship.  Pre-vetted, endorsed and funded projects are scheduled based on multiple factors; minimizing transit time, maximizing science time, matching and timing schedules and the number of days needed onboard.  “Scheduling ship time in an integrated, inter-disciplinary way is a big planning effort,” said Dr. Avery.   Research will include mapping of the seafloor, launching of buoys, ROVs and other equipment, studying how currents affect acoustic signatures, microbial content of the northern waters, discovering how climate change and sea level rise are impacting the North Atlantic, and how the ocean in turn impacts climate changes.  The focus will be on the entire eco-system.  The physics, biology and chemistry of the high latitude oceans will fall within the Neil Armstrong’s mission area.

    Design Team
    GPA was hired by DCI to provide a Basic Design during the Phase I NAVSEA design competition.   When the team’s design was awarded the build contract in October 2011, GPA’s engineers and Naval Architects went to work on the detail design and production engineering.  GPA collaborated with Siemens Marine for the propulsion and automation systems.  Siemens will be designing, engineering, and commissioning the diesel electric and automation system. 
    GPA and DCI have partnered on projects in the past ranging from a Navy Sea Jet, an Advanced Electric Ship Demonstrator, to fire boats, ferries, tugs and trawlers.  Both companies have worked on multiple Navy projects independently as well.

    Shipyard
    Dakota Creek Industries (DCI), located in Anacortes, Washington since 1975, began construction on AGOR 27 in mid-2012.  The Navy exercised its option for a second vessel in February, 2012, and the shipyard began shifting its workload around to fit the second vessel into the schedule.  Hollie Anthonysz, DCI Program Manager of vessel construction, said the shipyard’s first experience as the sole source on a military ship was positive and they are looking forward to the launch of the second ship.  
    DCI is a Puget Sound shipbuilding and repair facility specializing in steel and aluminum vessels up to 450 feet and 275 tons.  Located in the deep waters of the Guemes channel, it offers a protected harbor with easy access to Pacific waters.  Its facility includes a Syncrolift ship lift and a drydock.
     

    Design Specifications
    The vessels were designed for global operations in support of national security interests in the marine field, and other national oceanographic scientific endeavors.  The ships are 238 ft in length overall, have a sustained speed of 12 kts, can stay at sea for a minimum of 40 days, and travel over 11,000 nautical miles without refueling.
      In addition, they have the most modern scientific laboratory facilities and workshops afloat, high-tech computer and oceanographic equipment and hotel facilities to support 24 scientists and a crew of 20.    They are built to ABS Under 90 Meter rules, and will be certified as A1, Circle E, AMS, ACCU, NIBS, Ice Class D0, and UWILD.  The design is also compliant with 46CFR Subchapter U (Oceanographic Vessels).
    Working deck space is a premium in oceanographic work.  The AGOR vessels have 2,557 sq. ft. of clear deck space with 1,873 sq ft of that space on the open aft deck.  Design specifications included being fully operational in Sea State 4 and able to handle dynamic positioning relative to a fixed position in Sea State 5 with a 35-knot wind and 2-knot current.
    Additionally, the ship had to be as operationally quiet as possible.  A great deal of ocean research involves listening.  Excessive ship noise would negate that effort.  GPA’s unique hull design meets the Bubble Sweepdown performance requirement of the original specifications by diverting bubbles away from the sensitive sonar area.  Model tank tests performed in Poland confirmed the Phase 1 design efforts met the Navy’s exacting standards.   Completing the noise dampening goal, designers chose systems, defined equipment locations and designed special installation methods with acoustics as a priority.

    Equipment
    DCI has teamed with a multitude of local, national and international vendors to outfit the ship with the best equipment available, meeting the various needs and requirements of the scientists for a quiet, efficient, fully integrated and highly resilient blue-water platform from which they can perform their experiments and studies. 
    Over the next two months, Siemens will be installing their new Blue system.  This advanced, multi-drive, low-voltage system manages the speed of various AC propulsion motors controlling the propellers, stern thruster and bow thruster.  The system provides enhanced reliability with multiple failsafe features, lower maintenance costs, increased efficiency, and increased operational ease for the crew.  Reduced fuel consumption results in lower greenhouse gas emissions.  Siemens is also supplying the majority of the electrical switchgear, the ACCU automation, and condition-based monitoring system.
    The vessel uses four vibration-isolated Cummins QSK38-DM main generators providing a maximum of 3952 kW integrated electric power for all functions of the ship, including propulsion.  The integrated diesel-electric plant allows for multiple generator configurations, ensuring the diesel engines operate at peak efficiency at all times.
    A unique feature of the electric propulsion will be a “combinator” style control function integrating management of motor speed and propeller pitch on the Hundested-supplied Controllable Pitch Propellers. 
    Although fairly common in controllable pitch systems with direct drive diesels, use of the combinator control is unusual in variable-speed electric drive systems.  The combinator increases operational flexibility by allowing the operator to set the propeller at its most efficient setting across a range of operations including heavy towing and cruising.
    Design specifications were stringent for deck cranes and winches.  They needed the capacity to load equipment weighing more than 20,000 pounds including the deployment of ROVs, buoys and other heavy equipment.  The stern frame required a minimum of 12-foot inboard and outboard reach.  As designed, the frame  provides 15 feet of clearance above the deck and 27 feet of clear space between the block attachment points, all while maintaining a Dynamic Safe Working Load of 30,000 pounds through the full range of motion.  Allied Marine supplied the stern frame along with the portable TK4-30 portable crane and the TK 70-70 aft-deck Main Crane.  They also supplied the Motion Compensated CTD Handling System and the Starboard Side Handling Device, both of which extend to the waterline for improved safety and load control.
    Seattle based Markey Machinery supplied two electric-motor driven CAST-6-125 Hydrographic Winches, and the DETW-9-11 Traction Winch, both with AC Variable Frequency Drives System and electric motors for precise control.
    Kongsberg Maritime, a 200-year-old Norwegian company, produces a full line of specialty SONARS used in scientific research, fisheries and oil exploration.  For Phase III of the project, Kongsberg will supply advanced SONAR systems.  Although specifics are not confirmed at this time, projected equipment includes deep water and mid-water Multi-beam units, a HiPAP Gantry with a Sonardyne single beam survey system, and a SONAR Synchronization System.   A Sub-bottom Profiler SONAR is expected as well.  Additional equipment plans include a Transducer Array, a Mid-water Echo Sounder, and three Current Profilers operating at different frequencies, all are scheduled for installation in Phase III, subject to change as the project progresses.
    AGOR 28, the second vessel in the Armstrong Class, will be named R/V Sally Ride in honor of the first female astronaut and the youngest person to go into space.  The R/V Sally Ride will be operated by Scripps Institution of Oceanography, University of California, San Diego, where Ms. Ride was a faculty member before becoming an astronaut.   The second vessel will mirror the basic ship equipment with some variations in the scientific outfitting.  The christening date for the Sally Ride is scheduled for later this summer.
     


    AGOR 27 Neil Armstrong Main Particulars

    Yard     Dakota Creek Industries (DCI),
    Designer    Guido Perla and Associates, Inc. 
    Owner    NAVSEA
    Operator    WHOI
    Organizations     NAVSEA, the Office of Naval Research (ONR), the National Science Foundation (NSF) and the University National Oceanographic Laboratory System (UNOLS), Woods Hole Oceanographic Institution (WHOI
    Class    ABS
    Main engines    Cummins
    Cranes    Allied Marine
    Winches    Markey Machinery
    Sonar    Kongsberg Maritime
    Survey    Sonardyne
    Schat Harding    Rescue Boat Davit SA135
    Schottel    Stern Thruster 1x 620kW (830 HP) 
    White Gill    Bow Thrusters 1x 686kW (920 HP)
    MTU    Emergency Generator 1x 210kW (280 HP)
    Propulsion System    Siemens Marine

    Over the next two months, Siemens will be installing their new Blue system.  This advanced, multi-drive, low-voltage system manages the speed of various AC propulsion motors controlling the propellers, stern thruster and bow thruster.  The system provides enhanced reliability with multiple failsafe features, lower maintenance costs, increased efficiency, and increased operational ease for the crew.  Reduced fuel consumption results in lower greenhouse gas emissions.  Siemens is also supplying the majority of the electrical switchgear, the ACCU automation, and condition-based monitoring system.

    Markey
    •     2x type CAST6-125 Deep Sea Research Winches with active motion compensation
    •     1x type DETW-9-11 All-Electric Traction Winch System with two storage drums
    • 1x instrumented flagging block
    • 1x ship board wire monitoring system
    •     1xtype WES-23 Electric Anchor Windlass with two wild cats and two warping heads.

    Kongsberg
    • Deep Water Multibeam Survey System EM-122
    • Mid Water Multibeam Survey System EM-710
    • Single Beam Survey System EA-600

    Allied Systems
    • Stern Frame A-30
    • Main Crane TK70-70
    • Portable Crane TK4-30
    • CTD Handling System CTD-Lars
    • Starboard Side Handling Device

    (As published in the May 2014 edition of Maritime Reporter & Engineering News - http://magazines.marinelink.com/Magazines/MaritimeReporter)

  • , construction and operation of the vessel. Dick Nelson, President of Dakota Creek Industries (DCI), the construction shipyard, spoke first followed by Chris Chuhran, VP of Guido Perla and Associates, Inc.  (GPA), the Seattle-based Naval Architecture and Marine Engineering firm that partnered with DCI for the

  • MR Feb-24#36  million dollars in  says Christensen. An active front)
    February 2024 - Maritime Reporter and Engineering News page: 36

    Environmental one once you have a variable speed shaft generator speci? ed,” Energy / The Switch. This adds up to several million dollars in says Christensen. An active front end converter with a DC fuel savings over the lifetime of the vessel. Link means you can add the control of the thruster, he

  • MN Feb-24#39  to hybrid-electric power.
© Chris Fabregas / Adobe Stock
)
    February 2024 - Marine News page: 39

    to convert up to three of vessels, with options for up to ? ve vessels in total. WSDOT WSF’s Jumbo Mark II class ferries to hybrid-electric power. © Chris Fabregas / Adobe Stock www.marinelink.com MN 39

  • MT Jan-24#52 .   
ing”; Cheryl Tulkoff, Chris Boyd; Electronic Systems)
    January 2024 - Marine Technology Reporter page: 52

    of systems 6. “Improved Ef? ciency & Reliability for Data Center Servers Using Immersion Oil Cool- IEEE and ASTM Committees. ing”; Cheryl Tulkoff, Chris Boyd; Electronic Systems Technologies Conference, May 2021 52 January/February 2024 MTR #1 (50-63).indd 52 1/31/2024 8:35:56 A

  • MT Jan-24#18 , Blue Star,  and my co-founder Chris Retzler and I started)
    January 2024 - Marine Technology Reporter page: 18

    been tested and Wave Energy. And then the funding opportunity came up at sea for more than 14 months. Our ? rst product, Blue Star, and my co-founder Chris Retzler and I started Mocean. will be 20 kW of wave energy and ? ve kW of solar and that will be about saving money and CO2 in offshore operations

  • MR Dec-23#26  NOISE 
ICS 
ICS 
NCE 
IWSA 
Chris  Dr.  Jesse  Gavin 
Waddington:)
    December 2023 - Maritime Reporter and Engineering News page: 26

    UNDERWATER NOISE ICS ICS NCE IWSA Chris Dr. Jesse Gavin Waddington: Seyedvahid Spence: Allwright: If considered at Having wind Vakili It’s not just an early stage, onboard also estimates that a and by careful a case of enables range 10% reduction in consideration to be extended speed

  • MR Dec-23#25  measurement of URN, 
explains Chris Waddington, Technical)
    December 2023 - Maritime Reporter and Engineering News page: 25

    is the develop- ment of a Noise Management Plan for a ship. The guidelines include lists of suitable techniques for measurement of URN, explains Chris Waddington, Technical Director at the In- ternational Chamber of Shipping (ICS). Shipowners can de? ne their own targets or adopt the goals of quiet

  • MN Nov-23#58  or 
Austal USA has hired Chris Or-
managerial support)
    November 2023 - Marine News page: 58

    Hires made signi? cant technical achieve- ments in the marine industry or who Orlowski as VP have contributed organizational or Austal USA has hired Chris Or- managerial support to making such lowski as vice president of engineering. technical achievements possible. Powers Gunderson Stoik Schneider

  • MN Nov-23#54 ?  c set of missions,” said Chris Free-
extended 12- or)
    November 2023 - Marine News page: 54

    environment and then wrapped around the cable surveys for offshore wind and telecommunications for ideal sensors for a speci? c set of missions,” said Chris Free- extended 12- or limited 24-hour operations, the newbuild le- man, SVP at Geodynamics. “This new best-in-class vessel will verages fundamental

  • MN Nov-23#51  for the investment,” said 
Chris Gunsten, Great Lakes’)
    November 2023 - Marine News page: 51

    . “The Multi Cat brings step change safety improvements to Great Lakes’ dredge pipeline operations, which was a prime driver for the investment,” said Chris Gunsten, Great Lakes’ senior vice president of project services and ? eet engineering. “Pipe handling and connection work can now take place securely

  • MN Nov-23#48  choice, Gunsten said, “In es-
Chris Gunsten, SVP of project)
    November 2023 - Marine News page: 48

    hopper dredge, they can have larger hoppers,” Webb said. ing contractor’s ? eet renewal program. In con? rming the engine choice, Gunsten said, “In es- Chris Gunsten, SVP of project services and ? eet en- sence, the hopper dredge is a cargo vessel and it works on gineering, Great Lakes Dredge & Dock, said

  • MR Nov-23#67  courtesy Reintjes
Karl Senner  Chris Senner 
Reintjes Hybrid)
    November 2023 - Maritime Reporter and Engineering News page: 67

    TECH FEATURE: GEARS Image courtesy Reintjes Karl Senner Chris Senner Reintjes Hybrid System hybrids, fully electric vessels, energy storage systems, fuel cells, alternative fuels, and everything in between. Key areas of increased penetration in the market include de- livering Reintjes solutions to the

  • MR Nov-23#66  Trauthwein
rothers Karl and Chris Senner sit at the helm)
    November 2023 - Maritime Reporter and Engineering News page: 66

    related to the entire propulsion system, including electri? cation, both hybrid drives and full electric solutions. By Greg Trauthwein rothers Karl and Chris Senner sit at the helm to- in recent years include the towboat market, passenger vessels, day – Karl the President, Chris the Executive Vice dredging

  • MT Sep-23#73  surface of the water,” said Chris 
asset inspection and)
    September 2023 - Marine Technology Reporter page: 73

    free gateway for marine data through ments, making it an ideal solution for offshore surface vehicles (USV) built the surface of the water,” said Chris asset inspection and exploration across by Kongsberg Maritime for Reach Sub- Brooks, CEO of CSignum. “RadiEM industries. sea. The Reach Remote

  • MT Sep-23#37 VideoRay 
CEO: Chris Gibson
www.videoray.com
With more)
    September 2023 - Marine Technology Reporter page: 37

    VideoRay CEO: Chris Gibson www.videoray.com With more than 4,000 vehicles delivered worldwide, Vid- since it entered into a Production-Other Transaction Agree- eoRay is a leading inspection-class underwater robot manufac- ment (P-OTA) with VideoRay. One of the many determining turer. VideoRay’s Mission

  • MT Sep-23#8  Xavier Orr, Chris Shaw
www.advancednavigation)
    September 2023 - Marine Technology Reporter page: 8

    MTR 100 Hydrus Exploring Ningaloo Reef. Advanced Navigation President/CEO: Xavier Orr, Chris Shaw www.advancednavigation.com Advanced Navigation__ Advanced Navigation develops AI navigation systems and Advanced Navigation will be among one of the ? rst Austra- robotic technologies for air, land, sea and

  • MN Oct-23#44  
Cooper Consolidated named Chris  Susan Shultz-Gelino,)
    October 2023 - Marine News page: 44

    director. Blanchard Named Executive Young Joins ACL Director at Cooper American Cruise Lines announced Alfultis Britton Cooper Consolidated named Chris Susan Shultz-Gelino, VP of trade rela- Blanchard as executive director. Billy tions, has retired after several decades Fitzpatrick will continue

  • MN Oct-23#11 , we were fortunate to run into Chris-
Army-Navy E Award (February)
    October 2023 - Marine News page: 11

    standards. After almost four years of talking were acknowledged at the highest level in the form of the to a lot of people, we were fortunate to run into Chris- Army-Navy E Award (February 1943). During WW2, Mar- tian Schiller and Brian Bogen, Seattle-natives themselves, key built winches for jeep tugs and

  • MR Sep-23#64 . . .(604) 254-4171
11 . . . . .Chris-Marine AB . . . . . .)
    September 2023 - Maritime Reporter and Engineering News page: 64

    . . . . . . . . . . . . . . . . . . . .www.autoship.com . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(604) 254-4171 11 . . . . .Chris-Marine AB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .www.chris-marine.com . . . . . . . . . . . . . . . . . . . . . .

  • MR Sep-23#11  Monitoring
Coming Soon!
chris-marine.com
MR #9 (1-17))
    September 2023 - Maritime Reporter and Engineering News page: 11

    effects of overtraining. Email: [email protected] And in terms of training governance more generally, the Performance & Emission Monitoring Coming Soon! chris-marine.com MR #9 (1-17).indd 11 9/7/2023 9:33:09 A

  • MN Jun-23#43   Marshall
Austal USA promoted Chris Young to 
to succeed Kevin)
    June 2023 - Marine News page: 43

    of CEO. DSC Dredge Promoted Dugan Austal USA Promotes Young, Hires Overstreet DSC Dredge appointed Doy Dugan Luongo Marshall Austal USA promoted Chris Young to to succeed Kevin Dolan as vice president and chief ? nancial of? cer. It has also vice president of production operations. promoted

  • MR Aug-23#48  available now,” said Morten Bo Chris-
container feeder to be)
    August 2023 - Maritime Reporter and Engineering News page: 48

    ?FUELED CONTAINER FEEDER Maersk Maersk has taken delivery of what it says is the world’s ? rst biomass waste being available now,” said Morten Bo Chris- container feeder to be fueled by methanol. tiansen, Head of Energy Transition, A.P. Moller – Maersk. The 2,100 TEU vessel was built at Hyundai Mipo

  • MN Aug-23#25 ? eet at the time) by Dr. Ralph Chris-
ty, a navy friend of)
    August 2023 - Marine News page: 25

    Clark was invited to be a guest on a ? ve-day training cruise on the F.D.R. aircraft carrier (the largest in the Navy ? eet at the time) by Dr. Ralph Chris- ty, a navy friend of the then ‘Clark Company’, who was charged with Pilot and Flight Crew Protection. That invi- tation and the ? ve days that ensued

  • MT Jul-23#37  area and boardwalk 
Credit: Chris Gardner, Public Affairs
further)
    July 2023 - Marine Technology Reporter page: 37

    had built the beach.” EXPANSION Expansion of the beach continued in the 1960’s, when the Parks Department extended the bathing area and boardwalk Credit: Chris Gardner, Public Affairs further east into the Brighton Beach area and constructed a public restroom. Several years later more public restrooms, new

  • MT Jul-23#22 ROV INTERVIEW CHRIS GIBSON, CEO, VIDEORAY
terri?  ed about)
    July 2023 - Marine Technology Reporter page: 22

    ROV INTERVIEW CHRIS GIBSON, CEO, VIDEORAY terri? ed about using ROVs because of job security. Today we good customer service, and we’re there to support them and are seeing new technologies coming aboard that are replay- their success. ing that same scenario with ROV pilots. This new technology makes it