The Aegis

  • CG-66, the 14th Aegis guided missile cruiser to be built by Ingalls Shipbuilding division of Litton in Pascagoula, Miss., was recently christened Hue City. The vessel became the first U.S. Navy warship named in commemoration of the efforts of U.S. Marines, soldiers and sailors involved in the battle to retake the old imperial capital of Hue from invading North Vietnamese in 1968.

    Principal speaker for the event was Congressman John P. Murtha of Pennsylvania's 12th Congressional District, a member of the House Appropriations Committee and chairman of the House Appropriations Defense Subcommittee. Congressman Murtha was introduced by Mississippi's Fifth District Congressman, Gene Taylor of Bay St.

    Louis.

    Mrs. Jo Ann Cheatham, wife of retired Marine Corps Lt. Gen. Ernest C. Cheatham Jr., served as the Hue City's sponsor.

    Other participants in the christening ceremony included General Cheatham; Rear Adm. Raynor A.K. Taylor, USN Deputy Assistant Chief of Naval Operations for Surface Warfare; Rear Adm. Walter H. Cantrell, USN, Vice Commander, Naval Sea Systems Command; Capt. R. Bruce Woodruff, USN, Supervisor of Shipbuilding, Pascagoula; and Jerry St. Pe, senior vice president of Litton and president of Ingalls Shipbuilding.

    The U.S. Navy's Aegis program, of which Hue City is the newest ship, is among the most important shipbuilding programs in America today. Aegis ships are designed and built to provide primary protection for the Navy's battle forces. Aegis cruisers are 567 feet long, with a beam of 55 feet. Four GE LM2500 gas turbine engines power the 9,500- ton ships to speeds in excess of 30 knots.

    The CG-66's Aegis Combat System, heart of the ship's capability, is a significant advance in fleet air defense. Four fixed array radar antennae, mounted on the four sides of the ship's superstructure, replace conventional rotating radars, enabling the ship and her crew to scan in all directions simultaneously.

    The Hue City is equipped with the MK 41 Vertical Launching System (VLS), a multiwarfare missile launching system capable of firing missiles against air, surface and underwater threats. VLS is composed of modules symmetrically grouped to form launcher magazines, located both forward and aft on the ship's deck.

    Ingalls Shipbuilding, lead shipbuilder for five of the latest classes of Navy surface combatants, has delivered 53 major warships into the Navy's fleets since 1975, a major portion of the surface combatants delivered during the period.

    As lead shipbuilder for the Aegis cruiser program, Ingalls has been contracted to build 19 of the 27 Aegis cruisers authorized for construction since 1978. Twelve Ingallsbuilt Aegis cruisers are now in the fleet, with a 13th to be delivered this fall. Ingalls is also building DDG 51 Class Aegis guided missile destroyers, with six ships under contract.

    In addition to its Aegis programs, Ingalls is producing the Navy's Wasp Class of multipurpose amphibious assault ships and overhauling the multimission destroyer USS John Hancock (DD 981).

    For free literature on the facilities and capabilities of Ingalls Shipyard, Circle 10 on Reader Service Card

  • and reliability. During a formal ceremony, Rear Adm. James B. Greene Jr., presented Thomas S. Marotta, Marotta's president, with the Aegis Shipbuilding Excellence Award. At that time, Adm. Greene stated, "Such performance and achieve- ment reflect with pride the dedication of the

  • Mobile, delivered the invocation. Aegis ships comprise the most important shipbuilding program in the U.S. today. The Mobile Bay and other ships of the Aegis class will provide the primary protection for the navy's battle forces well into the next century. The Aegis ships are designed to counter all

  • Missile and Surface Radar, Moorestown, N.J., has received $339 million in contracts for Aegis weapon systems for three additional U.S. Navy ships in the Aegis class of guided missile cruisers. The awards cover production and integration effort for the third and fourth cruisers in the series, CG 49

  • major warships into the Navy's fleets since 1975, a major portion of the surface combatants delivered during the period. As lead shipbuilder for the Aegis cruiser program, Ingalls has been contracted to build 19 of the 27 Aegis cruisers authorized for construction since 1978. Twelve Ingallsbuilt Aegis

  • sides of the ships superstructure, replace conventional rotating radars, enabling the vessel and her crew to "see" in all directions simultaneously. The Aegis system can simultaneously fire and direct more missiles at more targets, with greater accuracy, than any other weapons control system. Aegis

  • . Four fixed-array radar antennae, mounted on the sides of the ship's superstructure, enable the crew to "see" in all directions simultaneously. The Aegis ships compose the most important shipbuilding program in America today. The Leyte Gulf and other ships of the class will provide the primary

  • of the Valley Forge during her September 1984 christening, also participated in the commissioning ceremony. The Valley Forge and other ships of the Aegis class, the most important surface shipbuilding program in America today, will provide the primary protection for the Navy's battle forces well

  • The Aegis guided missile cruiser USS Chancellorsville (CG-62) was recently christened at ceremonies at the Pascagoula, Miss., shipyard of the Ingalls Shipbuilding division of Litton Industries. Principal speaker for the ceremony was the Hon. Trent Lott, U.S. Representative from Pascagoula, Mississipp

  • and build the lead ship of the new Aegis guided missile destroyer class, the Arleigh Burke (DDG-51). This ship is scheduled for launching in 1988. The Aegis cruiser/destroyer program is expected to extend to the turn of the century and perhaps beyond. Bath Iron Works, a builder of Navy and commercial

  • of Defense William Howard Taft IV was principal speaker at the recent christening ceremony for the U.S. Navy's newest, most powerful warship, the Aegis guided missile cruiser Valley Forge (CG-50). Built by Litton's Ingalls Shipbuilding division is Pascagoula, Miss., the new ship is the fourth

  • ordered recently under the FY 85 shipbuilding program. The other ship was awarded to Ingalls Shipbuilding, which was chosen as the lead yard when the Aegis cruiser program began in 1978. The latest contract brings to four the number of cruisers ordered from BIW; Ingalls has received orders for a

  • MR Oct-19#45 HISTORY DESIGN EVOLUTION
The Arleigh Burke design has)
    October 2019 - Maritime Reporter and Engineering News page: 45

    HISTORY DESIGN EVOLUTION The Arleigh Burke design has been the workhorse of the US Navy for over 20 years, and will be for another 40-50 years. or for NOAA, Coast Guard, or for Taiwan or Australia.” Outside of the government focus, our DLBA business has been a tremendous addition to the company. The

  • MT Apr-19#38  other AUV developed under the aegis of the EU is the  fact)
    April 2019 - Marine Technology Reporter page: 38

    the Singapore-based out? t said gether the same EU project). it was now ready to “go beyond current industry needs”. In The other AUV developed under the aegis of the EU is the fact, early in 2018, Swire Seabed had begun the Norwegian UX-1 (prototype) or UX-1b, a spherical vehicle equipped with government’s

  • MR Oct-18#62  a small crew, with no  Even the most modern warship is)
    October 2018 - Maritime Reporter and Engineering News page: 62

    ; smooth topside spaces with missile frigate was a 20-year “throw- New is Old embedded antennas; a high degree away” ship with a small crew, with no Even the most modern warship is, in of automation and resilient electrical, margin for more capability or more some ways, obsolete when it is commis- communication

  • MR Oct-18#61 the individual designs, inside the cost  • Italy and)
    October 2018 - Maritime Reporter and Engineering News page: 61

    the individual designs, inside the cost • Italy and France have built their of ships were adapted from previous parameters that we’re looking for to FREMM frigates with a common hull, classes and carried something new make that small surface combatant a but with general purpose and ASW vari- forward.

  • MN Sep-18#57  systems and components for 
the Aegis Radar System. He received)
    September 2018 - Marine News page: 57

    Car- dona has 32 years of experience in manufacturing. He has four patents and played a signi? cant role in the design of systems and components for the Aegis Radar System. He received his BSME from Drexel University. Hendricks Elected as Little Rock Port Authority Board Chair The Little Rock Port Authority

  • MR Mar-18#33  capabilities between LCS and the Aegis 
ing limited to just)
    March 2018 - Maritime Reporter and Engineering News page: 33

    t in the post World War II naval ship programs. “high / low” mix of surface combatant With the DDG 1000 programming be- capabilities between LCS and the Aegis ing limited to just three ships, the Navy cruisers and destroyers. FFG(X) will has restarted the DDG 51 production operate independently or

  • MR Aug-17#27 , generally for the bet- The Aegis cruiser USS Yorktown)
    August 2017 - Maritime Reporter and Engineering News page: 27

    in a mathematical equation. information technologies Those tech- nologies have largely been developed maritime industry, generally for the bet- The Aegis cruiser USS Yorktown (CG- Dividing anything by zero results in an piecemeal to address particular issues, ter. But there have been downsides.

  • MR Feb-16#52  equipment downtime. The AEGIS Shaft 
Voltage Tester)
    February 2016 - Maritime Reporter and Engineering News page: 52

    than ever to check in- service motors for damaging VFD-induced shaft voltages and head off bearing damage and costly unplanned equipment downtime. The AEGIS Shaft Voltage Tester Digital Oscilloscope is designed to take and capture highly accurate voltage measure- ments from the spinning shafts of motors

  • MR May-16#14  and position in the 
“Under the aegis of a plan called Vi-)
    May 2016 - Maritime Reporter and Engineering News page: 14

    generations, and they Hughes contends that there are some get the bene? t of the pooling agreement, have a certain cache and position in the “Under the aegis of a plan called Vi- central characteristics that remain. “It is and it was very high on my agenda when market that we would ? nd dif? cult to

  • MR Jun-16#24  partners re- The success of the Aegis system for BMD missions)
    June 2016 - Maritime Reporter and Engineering News page: 24

    News Contract Delivery Date - 28 February 2019 Est. Delivery Date - Fall 2018 ing capability. The Navy and its industry partners re- The success of the Aegis system for BMD missions duced the construction span by over two years from has resulted in the establishment of a land-based Aegis PCU Vermont

  • MR Jan-16#10  
search project is under the aegis of the 
at Statoil.)
    January 2016 - Maritime Reporter and Engineering News page: 10

    in the costs,” said Jone Stangeland, VP of area of 3D weld management. This re- logistics and emergency preparedness search project is under the aegis of the at Statoil. The supply vessels transport U.S. Navy’s National Shipbuilding Re- chemicals in tanks below deck. When search Program (NSRP)

  • MR Jun-15#43  of 2014 for the Block  with the Aegis Combat System, provide)
    June 2015 - Maritime Reporter and Engineering News page: 43

    contract in April of 2014 for the Block with the Aegis Combat System, provide A DDG Modernization program is pro- Steel was used for the third ship. IV Virginia-class attack submarines. the full spectrum of naval war? ghting viding a comprehensive mid-life upgrade “The Block IV award is the largest

  • MR Jun-15#41  Vinson   (CVN 70) Transit in the U.S.  3rd Fleet area of)
    June 2015 - Maritime Reporter and Engineering News page: 41

    Bremerton, WA USS Dwight D. Eisenhower (CVN 69) Final stages of DPIA at Norfolk Naval Shipyard. Newport News, VA USS Carl Vinson (CVN 70) Transit in the U.S. 3rd Fleet area of operations San Diego, CA USS Theodore Roosevelt (CVN 71) Deployed in the U.S. 5th Fleet area of operations. San Diego

  • MR May-77#16  13 interested 
shipbuilders, the Naval Sea Sys-
tems Command)
    May 1977 - Maritime Reporter and Engineering News page: 16

    Three Yards Each Receive $1 Million To Develop Plans For Destroyers From a group of 13 interested shipbuilders, the Naval Sea Sys- tems Command (NAVSEA) has selected three shipyards to assist in development of contract plans for the DDG-47 Aegis guided- missile destroyer program: Bath Iron

  • MR Sep-14#56  Adm. William Hilarides, 
the commander of the Na-
val)
    September 2014 - Maritime Reporter and Engineering News page: 56

    INTERVIEW V ice Adm. William Hilarides, the commander of the Na- val Sea Systems Command (NAVSEA), recently spoke to a small group of reporters about his vision for NAVSEA and the challenges and opportunities he faces. A decline in the number of skilled Sailors able to conduct repairs

  • MR Feb-15-80#48  
Classification To CG-47 
. The Department of the Navy)
    February 15, 1980 - Maritime Reporter and Engineering News page: 48

    Navy Changes DDG-47 Classification To CG-47 . The Department of the Navy has an- nounced it is changing the classification of the DDG-47, a new ship currently under construction, to CG-47. The ship, which was originally classified as a guided missile de- stroyer with the hull number DDG-47

  • MR Jun-14#32  Navy is modernizing the Aegis 
?eet with a midlife)
    June 2014 - Maritime Reporter and Engineering News page: 32

    a new air and missile defense variant which will feature the new air and missile defense (AMDR) radar. Aegis Modernization The Navy is modernizing the Aegis ?eet with a midlife update to the com- bat systems and hull, mechanical and electrical (HM&E) systems. Some Aegis ships—including destroyers

  • MR May-80#34  
in combination with the AEGIS 
combat system. 
Herbert)
    May 1980 - Maritime Reporter and Engineering News page: 34

    new cruiser. AEGIS cruisers will utilize the hull and propul- sion systems developed for the Navy's Spruance class destroyers in combination with the AEGIS combat system. Herbert J. Cabral, Westing- house marine division general manager, said the reduction gears will be built to stringent sound- dam

  • MR Jul-15-80#6  Compa-
ny recently delivered the Western 
Narrows, an ultramoder)
    July 15, 1980 - Maritime Reporter and Engineering News page: 6

    Mangone Delivers Advanced Offshore Research Vessel Mangone Shipbuilding Compa- ny recently delivered the Western Narrows, an ultramodern, geo- physical research and survey ves- sel with SCR (silicon-controlled rectifier) diesel-electric propul- sion, to Western Geophysical Com- pany of Houston.

  • MR Sep-80#38  total-
ing $23,725,000 from the U.S. 
Navy, providing)
    September 1980 - Maritime Reporter and Engineering News page: 38

    Stewart & Stevenson Gets Navy Contracts Totaling $23.7 Million Stewart & Stevenson Services, Inc. has received contracts total- ing $23,725,000 from the U.S. Navy, providing ship's service auxiliary power for three classes of vessels. Stewart & Stevenson will sup- ply Detroit Diesel Allison

  • MR Dec-15-80#32  for international business at the corpo-
ration)
    December 15, 1980 - Maritime Reporter and Engineering News page: 32

    was made manager of commercial marketing. Nicholas M. Baker Donald J. Main Mr. Baker was assistant marketing direc- tor for international business at the corpo- ration's Pomona Division. Prior to joining General Dynamics in February 1979, he held a number of positions with General Electric including

  • MR Jan-81#60 Total Hull Est. GT Est. DWT Est. HP Est. Total 
Builder)
    January 1981 - Maritime Reporter and Engineering News page: 60

    Total Hull Est. GT Est. DWT Est. HP Est. Total Builder Owner No. Type Nos. (Each) (Each) (Each) Cost ($Mil.) American Ship Building Interlake Steamship 1 Bulk 909 32,000 59,000 D-16,000 50.0 Avondale Shipyards American President Lines 3 Container 2329-31 40,500 30,300 D-43,200 330.0 Suwanee River 3

  • MR Apr-81#27  
To Cost Of $26.5 Million 
The Maritime Administration)
    April 1981 - Maritime Reporter and Engineering News page: 27

    Crowley Subsidiary Asks Title XI On Five Barges To Cost Of $26.5 Million The Maritime Administration has approved in principle an ap- plication by Trailer Marine Trans- port Corporation, a subsidiary of Crowley Maritime Corporation, San Francisco, for Title XI fi- nancing to aid in construction

  • MR Jul-15-81#8 ON THE COVER 
First Of New Destroyer Class 
Commissioned)
    July 15, 1981 - Maritime Reporter and Engineering News page: 8

    ON THE COVER First Of New Destroyer Class Commissioned At Ingalls Yard Santa Fe Diving Services Awarded Contract To Provide RCV And Crew Santa Fe Diving Services, Inc. of Houma, La., has been awarded a contract by Montreal Micoperi J.V. to provide a remote-con- trolled underwater vehicle