Page 19: of Marine News Magazine (November 2013)

Fleet Optimization Roundtable

Read this page in Pdf, Flash or Html5 edition of November 2013 Marine News Magazine

First contract for newly designed Damen Offshore Carrier 7500Van Oord has ordered a new cable-laying vessel. The ship will be built at Damen Shipyards Galati in Roma- nia and will be completed at the end of 2014. The ves- sel is intended for the installation of electricity cables for offshore wind farms. Van Oord is making preparations for the Gemini offshore wind farm which will be con- structed 60 kilometers to the north of the Dutch Wadden Islands. The cable-laying vessel will be deployed at that site, among many others. The vessel will be a multipur- pose vessel with a length of 120 meters, a beam of 28 me- ters and a dynamic positioning system. It will be equipped with a cable carousel of more than 5,000 tonnes and a heavy crane that will enable it to lay heavy and long ex-port cables. On board, 90 people can be accommodated. The new Van Oord cable layer is based on the Damen Offshore Carrier, a new multipurpose vessel design with a ß ush working deck, Heavy Lift or RoRo transport as well as offshore installation capabilities suitable for mul- tiple markets. To this purpose, a large volume of (offshore) installation equipment can be mounted on the vessel and the design can be adapted to create a dedicated ship, such as the vessel desired by Van Oord. www.marinelink.com MN November2013 Layout 18-31.indd 19MN November2013 Layout 18-31.indd 1910/28/2013 3:13:27 PM10/28/2013 3:13:27 PM

Marine News

Marine News is the premier magazine of the North American Inland, coastal and Offshore workboat markets.