Page 10: of Marine News Magazine (April 2016)
Boatbuilding: Construction & Repair
Read this page in Pdf, Flash or Html5 edition of April 2016 Marine News Magazine
BY THE NUMBERS
SMS related equipment Amount (USD)
Engine room ? xed pipe systems for MDE oil $4000
Power loss emergency light installation $2000 (avg. 8 lights at $250 each)
Fixed ? re extinguishing system (galleys & stoves $1200 – $2500
Engine room remote monitoring (cameras)* $1500 – $3000
Fire retardant paneling $3500 – $20,000
Multi – point alarm system (10 – 30 points) $10,000 – $22,000
Mechanical seals to facilitate dry bilges $40,000
Electronic charting/AIS interface (Wheelhouse) $1200 – $9700
Electric start/stop E/R equipment - Wheelhouse $4500
CEMS speci? c:
Noise reduction (additional insulation) $1000 – $30,000
Blackout shades and green lighting $1000
RCP third-party auditing/monitoring cost $1800 – $5000
Total $76,200 – $143,700
Table 1 (800 – 2000 hp towing vessels)
Company SizeTowing VesselsAudit Team Cost Plus ExpensesAudit Time (Days)
Small <10 1 or 2 $2,500-$3,500 1.5
Medium 10 – 20 1 or 2 $3,000-$6,000 1.5 – 2.5
Large >20 2 $4000 to $6000 2.0 – 3.0
Table 2 – Cost & Time of Third-Party Audits of a Company SMS
Size of VesselLength of Vessel# of Auditors Per Cost Plus ExpensesDays to Complete
Vessel
Small <65 feet 1 $1,000 - $2,500 1.0 - 1.5
Large =65 feet 1 $1,000 - $3,000 1.0 - 1.5
Table 3 – Cost & Time for Towing Vessel Audits
Category Potential Per Vessel Range of Unit Cost to Comply with Standard
Hull and Machinery $69,500 – $297,000
Navigation and Communication $9900 – $38,950
Pollution Prevention $16,020 – $125,600
Life-saving $4716 – $11,859
Fire? ghting $2,055 – $72,065
Total $102,191 – $545,474
Table 4 – Existing UTVs (Constructed prior to effective data regulation)
April 2016
MN 10
MN April16 Layout 1-17.indd 10 3/18/2016 11:41:56 AM