Page 48: of Marine News Magazine (November 2025)
Read this page in Pdf, Flash or Html5 edition of November 2025 Marine News Magazine
Baltic Workboats
Test Ride hen Jim Weber heads to work, there’s
Engineering the Details no bridge, tunnel or ferry schedule.
The CARGO 17WP’s systems read like an encyclope-
His commute — six miles across open dia of modern marine engineering. Noise and vibration water off the Hamptons in New York are controlled through layers of Swedac and Temtex damp-
W — depends entirely on the weather … ing, Isover insulation, and Firemaster Marine Plus Blanket and on the rugged new aluminum boat now docked there.

47

49