Page 68: of Offshore Engineer Magazine (Jan/Feb 2013)
Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2013 Offshore Engineer Magazine
recoverable oil and gas reserves at
Tubular Bells estimated at more than 120mmboe.
The geological and geographical setting of the feld is such that infrastructure developed for Tubular
Bells will be used to develop other
Field Development nearby discoveries. Only 17 miles of export pipeline from Tubular Bells are required to tie into William’s
Canyon Chief gas pipeline and the
Mountaineer pipeline.
Putting it all together
First and foremost in the project - is the central processing facility, which will be installed in MC724. courtesycraymedia
Williams Partners will design and Figure 2. Installing Gulfstar FPS triple-deck topsides onto spar. construct the central facility, called
Gulfstar FPS – a classic, three-deck, oil, gas and NGLs. It currently built in the US. Williams expects to wet-tree spar design (Figure 2) – transports about 14% of US natural deliver the facility by mid-2014.
including oil and gas gathering, gas. It will own the topsides/spar Helping to achieve the fast production handling, gas processing facility while Hess will operate it. delivery, Williams will be building services and the export pipelines. Williams’ Stafford Menard, all of Gulfstar’s major components
Williams Partners is a diversifed manager for Gulfstar, says the FPS is on the US Gulf Coast, with more
MLP (master limited partnership) in a ‘frst’ in many respects. Although than 90% of the materials and the business of processing natural there has been a cell spar built, it’s sub-components sourced in the gas and liquids, and transporting the frst spar, classic or truss, to be US, and coming from about 20
Produced Water
Management 2013
The event to attend for technology update and sharing operational experiences on produced water management. 22.-23. JANUARY, STAVANGER - NORWAY
REGISTER BY 7. JANUARY +47 22 94 75 60 / 61
REGISTRATION [email protected] www.teknakurs.no
Tekna - The Norwegian Society of Graduate
Technical and Scientifc Professionals
OE | January 2013 oedigital.com 70 120924 Annonse Produced Water Manage / Seabed Mapping 1 06.12.12 15:35 oe_topsides.indd 70 03/01/2013 13:56