Page 4th Cover: of Offshore Engineer Magazine (Jan/Feb 2013)
Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2013 Offshore Engineer Magazine
PowerDrive
Archer
HIGH BUILD RATE RSS
High Build Rate RSS Eliminates NPT,
Saves 4 Days Offshore Asia
PowerDrive Archer RSS eliminated nonproductive time in unconsolidated formations offshore Asia, reducing drilling time by 4 days and saving USD 4.5 million. By maintaining full trajectory control, the high build rate RSS drilled six low-tortuosity lateral wells, steering through drop zones where other RSSs had been unable to hold the desired angle.
Read the case study at slb.com/Archer
PowerDrive Archer is a mark of Schlumberger. © 2013 Schlumberger. 12-DR-0328 oedigital.com January 2013 | OEoedigital.com January 2013 | OE 8484 oe_JAN13_084.indd 84 03/01/2013 16:53