Page 23: of Offshore Engineer Magazine (Feb/Mar 2013)

Read this page in Pdf, Flash or Html5 edition of Feb/Mar 2013 Offshore Engineer Magazine

Subsea 7 will provide

Contract Briefs engineering, fabrication,

Global briefs and installation of a

Dolphin Drilling and Petrobras have agreed company’s Western Isles development project. 16km-long pipeline, two to a one-year contract extension for the The US$300 million contract calls for the semisubmersible . The contract, engineering, procurement, construction slug catchers, and two

Borgny Dolphin cantilever structures. worth US$90 million, extends its deployment and installation of two 2.5km-long pipeline

Offshore operations are until September 2014. bundles and one 11km-long gas export pipeline.

GDF Suex E&P UKpicked Technip to provide Offshore work is slated to begin next year.

underway.

installation services at its Juliet ? eld project GDF Suez and APGDC have awarded

K in the UK North Sea. The contract covers the WorleyParsons a pre-feed study for their Ogna wildcat Ogna wildcat tie-back to the Pickerill A platform and includes Andhra Pradesh FLNG terminal off India. The spudded the installation of a 12in diameter, 22km-long study will assess ? oating terminal options

Lundin Petroleum spud rigid ? owline, one 22km-long static controls including marine jetty con? gurations with its Ogna exploration well, umbilical, one 12in diameter riser and one FSRUs. The contract’s scope includes the in PL453S, off Norway. 16in J-tube assembly, as well as a 100-tonne subsea pipeline and onshore receiving facility

Drilled by the Maersk manifold. design.

Guardian, the wildcat

FMC Technologies has won a US$114 million McDermott International has received will target hydrocarbons subsea equipment order from LLOG Exploration. a US$230 million turnkey contract for in the upper to middle

The supply contract calls for the delivery of Pemex’s Litoral production platform. Scope

Jurassic reservoirs of nine subsea trees, four subsea manifolds, ? ve includes FEED design, detailed engineering, the Ogna prospect, multiphase meters and associated topside procurement, fabrication, loadout, transport, located 65km northeast control systems, and subsea distribution installation, hook-up, commissioning and of BP’s Ula ? eld in the systems to LLOG’s Delta House project in the start-up of an eight-legged 1800-tonne jacket southern North Sea.

Mississippi Canyon area of the US Gulf. and 4500-tonne topsides together with 2000

Ogna is estimated to

Dana Petroleum has chosen Subsea 7 tons of tripods, bridges and piles. Full project contain unrisked, gross, to provide subsea EPIC services for the completion is slated for 2Q 2015.

prospective resources of 156mmboe.

A leading designer and manufacturer of bespoke metering, hydraulic control systems and produced water treatment solutions

In your world, each new project is a new adventure— and a new challenge.

Visit us at:

AOG Stand Q25

Metering Produced

Manufacturer Water Treatment

We understand.

Hydraulic Systems Customer

Manufacturer Service We are your global work team.

If you work in the projects, facilities, and construction discipline of the upstream oil and gas industry, now is the time to join the Society of Petroleum Engineers.

We have developed new products and services focused on your technical and professional needs, including the new Oil and Gas Facilities magazine.

Wickwar • Aberdeen • Great Yarmouth • Dubai • Dammam • Moscow • Singapore

And, with 104,000+ members around the world, you will never meet a new challenge alone.

www.alderley.com

Learn more and join today at www.spe.org/go/OE or scan the QR code to get there faster.

oedigital.com February 2013 | OE 25 oe_globalbriefs.indd 25 31/01/2013 10:26 2012_PFC_Membership_Ad_HH_01.indd 1 12/20/12 1:37 PM

Offshore Engineer