Page 19: of Offshore Engineer Magazine (Mar/Apr 2013)
Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2013 Offshore Engineer Magazine
semisubmersibles are
Contract Briefs currently stationed at
Global briefs
Pemex’s Cantarell ? eld.
Tenaris renewed Wood Group Kenny won a long-term supply deal a
Bareboat charter contracts with Brazil’s Petrobras last month. Under US$8.6 million contract from Inpex for Safe Britannia, Safe the agreement, Tenaris will supply large Maselato perform FEED work for the subsea
Lancia, and Jasminia diameter casing pipes with TenarisHydril production facilities at the Abadi LNG semisubmersibles have
Wedge Series 500 premium connections project off Indonesia. The contract involves been extended until end- and other products until 2017. the subsea, umbilical, riser and ? owline
March, mid-September,
Shell has awarded Subsea 7 a systems, including subsea structures and and late May, respectively.
US$135 million contract for work on its equipment.
The total value of these
Statoil contractedHeerema Fabrication
Fram oil and gas development located latest extensions is about
Group 220km east of Aberdeen, Scotland. ’s Vlissingen yard for the engineering,
US$21 million.
Subsea 7 will handle the engineering, procurement, and construction of a ? xed procurement, fabrication, and installation of jacket and pre-drilling module for the Dagny
T Ecuadorean Ecuadorean a 4.5km in-? eld pipeline bundle measuring ? eld development in the central North Sea. seismic 44in in diameter, with integrated manifolds The 16,000-ton jacket will be the largest
WPG Group initiated the and tie-in structures. launch jacket built at the yard.
Jupiter_HFV_Ad_Layout 1 08/02/2013 15:12 Page 1 acquisition of 2D and
TGS announced Latin America’s Telmex it will charter the contracted 3D surveys last month
Polarcus Asima 12-streamer for a six- Offshore Marine Management to supervise in Ecuador’s transition month period. TGS will utilize the ship and assist with repairs to the shore-end and shallow water zones during an acquisition of a 3D multi-client section of an existing ? ber optic connection 2 for the State Sevmorgeo survey covering 7800km of the Sun? sh between the Mexican mainland and
Company (SMG). SMG is acreage in Harper Basin, off Liberia. TGS will Cozumel. Offshore Marine Management utilizing Fair? eld Z-700 perform data processing and make the data installed protective pipe onto the submarine ocean-bottom nodes in available to clients by Q4 2013 prior to the cable section, providing protection and combination with portable
Liberia 2013 Bid Round. expanding the pipe’s lifespan.
sources provided by WPG.
High performance under pressure
The new Jupiter High Flow Valve Pack delivers accurate control of pressure & flow up to 160 lpm and 210 bar for high flow/ high power applications. This compact and low cost unit is suitable for use with any Jupiter 2 Control
System for a variety of subsea tooling applications.
Zetechtics Ltd
Tel: +44 (0) 1653 602020 | Web: www.zetechtics.com oedigital.com March 2013 | OE 21 oe_globalbriefs–rev2.indd 21 27/02/2013 11:21