Page 26: of Offshore Engineer Magazine (Mar/Apr 2013)

Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2013 Offshore Engineer Magazine

The recovery challenge

Brown? elds

In 2007, the Tordis SSBI was installed in 650ft of water.

OE | March 2013 oedigital.com 28 oe_BrownfieldFMC_rev2.indd 28 27/02/2013 11:27

Offshore Engineer