Page 26: of Offshore Engineer Magazine (Mar/Apr 2013)
Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2013 Offshore Engineer Magazine
The recovery challenge
Brown? elds
In 2007, the Tordis SSBI was installed in 650ft of water.
OE | March 2013 oedigital.com 28 oe_BrownfieldFMC_rev2.indd 28 27/02/2013 11:27