Page 112: of Offshore Engineer Magazine (Apr/May 2013)

Read this page in Pdf, Flash or Html5 edition of Apr/May 2013 Offshore Engineer Magazine

Numerology The year, prior to 2012, that US crude oil production last exceeded 7mmb/d. 1992 (Source: US Energy Information Administration)

The year that Asgard’s subsea gas compression system will start up. (Source: Statoil) 2015

For Project 20KTM, Maersk Drilling will design rigs capable of withstanding HPHT environments up to 20,000psi and 350°F. (Source: BP) 350°

The number of US jobs that the oil & gas industry supports. (Source: Chevron) 9,200,000

Coral 3 is the eighth well drilled in Area 4, off Mozambique. It encountered 117m of gas pay and added 4tcf in reserves to the Mamba complex. (Source: Eni) #8

Tonnes of steel used to build Total’s laurentpascal

Pazfor FPSO. 120,000

See Geographic Focus, page 78.

Length, in kilometers, of a subsea power cable installed between Ireland and Wales.

See Sensa story, page 62.

278

Tons of seamless pipe that Tenaris plans to produce annually at its Bay City, Texas, facility. (Source: Tenaris) 600,000

The global oil demand estimate, in b/d, for 2013. (Source: International Energy Agency) 90,700,000

The weight, in tons, of the CX-15 buoyant tower hull installed off Peru in September 2500 2012. (Source: Wison Offshore & Marine)

OE | April 2013 OE | March 2013 oedigital.comoedigital.com 114114 oe_numerology.indd 114 4/1/13 12:49 AM

Offshore Engineer