Page 20: of Offshore Engineer Magazine (Apr/May 2013)
Read this page in Pdf, Flash or Html5 edition of Apr/May 2013 Offshore Engineer Magazine
rine dock, a 25,000 sq m
Global Briefs facility carved out of a mountain with tunnels for
Contract Briefs direct access to the sea, and a helipad.
Palfnger Dreggen has been awarded a contract
K
KG D6 for the delivery of 28 cranes to Sembcorp investment
Reliance Industries and
Marine’s subsidiary Jurong
BP plan to invest US$5
Shipyard. The contract billion in deepwater gas includes the supply of development of the KG D6 cranes for seven drillships block over the next three to Sete Brasil, scheduled to fve years. The plan pro- for delivery 2014-17. posed will develop about
Keppel Offshore &
H 4tcf of discovered natural ’s subsidiaries Baúna starts producing
Marine gas reserves. The part- won two contracts worth Petrobras began producing at Baúna feld, in the southern Santos ners plan to optimize KG
S$200 million (US$161.5 Basin, off Brazil. The FPSO , which arrived at the
Cidade de Itajaí
D6 through compression million) from repeat custom- feld in December, was connected to well 9-SPS-88. That well is and water handling. BP ers. Keppel Fels Brasil’s estimated to produce up to 12,000b/d. Over the next few months, contract is with MODEC and Petrobras expects to connect ten more wells – fve production, expects to begin a drilling
Toyo Offshore Production four water injection, and one gas injection to the FPSO, and reach program to test a deeper Systems, to integrate the peak production in August. The FPSO can process 80,000 bbl of reservoir. topside modules of an light oil (34°API) and 2mmcm/d of gas. It is anchored in 275m of
L
FPSO unit. In Singapore, water, 210km off the coast.
South Kecapi
Keppel Shipyard has been fnd engaged by SBM Offshore to plan to conduct a joint pect discovery in Dussafu Salamander Energy found fabricate an internal turret study on LNG develop- Marin PSC, offshore oil and gas pay at its for a newbuild FPSO, to be ment in the Russian Far Gabon. The discovery South Kecapi-1 DIR/ST installed in the Ichthys feld,
East. well, Dussafu Tortue exploration well in the offshore Australia.
Marin-1 (3430m TD, 118m Botang PSC in the North
G water depth), found oil in Kutei basin off Indonesia.
Aker Solutions has PSVM the pre-salt Gamba and The well found a com- signed a contract with production starts
BP began production from Dentale reservoirs. The bined 40m of net oil and
Statoil for the supply of a the PSVM development confrming sidetrack, gas pay in high-quality, subsea production system in block 31, off Angola. DTM-1ST1, found pay stacked, Pliocene channel for the Aasta Hansteen
Three wells at the Plutao in the Dentale reservoir sandstones. A drill stem feld development project feld are expected to southwest of the original test fowed light oil at on the Norwegian Conti- increase production at well, but with better reser- a rate of 6000b/d (con- nental Shelf. The contract
PSVM to about 70,000b/d voir character. It is cur- strained) and 8mmcf/d of value is about NKr2 of oil. Output will rently being appraised. gas. billion. The work includes increase to 150,000b/d Diamond Offshore’s three template-manifold
J once Saturno, Venus, and Ocean General semisub-
Mountain lair to structures, seven subsea
Marte felds come online mersible drilled the well enter service trees, wellheads, con- later this year and next. Norwegian Ministry of to 2102m TVDSS. trols, workover, and tie-in
Forty production, gas, Defense approved the systems.
M and water injection wells sale of Olavsvern naval
Tender rig sale
Heerema Fabrication will be connected to the base, 20km outside of Norway’s Seadrill com-
Group’s Vlissingen yard
FPSO through 15 subsea Tromsø, to investor group pleted the sale of its (Netherlands) signed an manifolds and associated Triko, which includes tender rig business to
EPC Letter of Award with subsea equipment. Odfjell Drilling, PSW Rig Malaysia’s SapuraKencana
Statoil for a 16,000 ton
Service, private investors. Petroleum for $2.9 launch jacket and 155
I
In cooperation with Petro billion. SapuraKencana
Sidetrack ton pre-drilling module
Support Group, Trikpo will acquire all the confrms discovery for the Dagny feld
Panoro Energy found 20m will convert the base to tender rigs in Seadrill’s development in the of oil pay in a sidetrack to an offshore service center. feet except for the West central North Sea.
its earlier Tortue pros- The property has a subma- Vencedor, T15, and T16.
OE | April 2013 oedigital.com 22 oe_globalbriefs_v2.indd 22 4/1/13 3:45 AM