Page 29: of Offshore Engineer Magazine (May/Jun 2013)

Read this page in Pdf, Flash or Html5 edition of May/Jun 2013 Offshore Engineer Magazine

0ft 750ft

LOCATION LOWER TERTIARY GULF OF MEXICO

FACILITY FIRST FPSO IN GULF OF MEXICO 1500ft

DEPTH 8,887 FT / 2,740 M

PRESSURE 19,000 PSI 2250ft

TEMPERATURE 250°F 3000ft

SERVICE HP/HT SOUR ENVIRONMENT

CASCADE AND CHINOOK 3750ft 4500ft 5250ft

THIS IS NO PLACE 6000ft

TO COMPROMISE.

Ultra deepwater ? elds like Cascade and Chinook require the highest levels of experience, technology and 6750ft environmental care. On every count, Tenaris delivered. Expertise gained in extreme offshore environments around the world. Quality manufactured line pipe products. Exceptional R&D that leads to better solutions.

That’s why more operators turn to Tenaris.

7500ft 8250ft

Quality that makes the difference.

9000ft ten100_oe_pipeline_ad_0822.indd 1 8/22/12 4:47 PM

Offshore Engineer