Page 15: of Offshore Engineer Magazine (Jun/Jul 2013)
Read this page in Pdf, Flash or Html5 edition of Jun/Jul 2013 Offshore Engineer Magazine
34/10-A-8 on the Gullfaks
A platform where the well test is was done, currently provides a production
Q
G of 7,500b/d. Preliminary
H calculations indicate 40-150MMboe of recover- able reserves. Statoil (70%)
I operates the feld with part-
J
K ner Petoro (30%).
P
H Fairfeld shots 3D
L
Fairfeld Energy began a
O
R
S 400sq km Broadband 3D
N seismic survey over Block
M 43/28, using the Polarcus
Nadia.
I
Energean explores Greece
Energean Oil & Gas plans to increase its exploration
G
F
Cretaceous fault block area is and production offshore FOGL to drill New Gullfaks reserves
Falkland Oil & Gas (FOGL) underway and a large 3D sur- Greece. The frm received will continue its 3D seismic vey in the Northern Licence Statoil and Petoro have $60 million from the newly- acquisition campaign and Area is planned for 4Q 2013. proven additional resources created Third Point Hellenic target exploration drilling FOGL said it would be defn- in the Shetland Group/Lista Recovery Fund. The cash in the second half of 2013. ing targets for exploration formation in the Gullfaks will fund a four-well pro-
A 1,000sq km survey over a drilling during 2H 2013. licence. Production well gram in 2013 with the goal
Powerful jumper and umbilical monitoring
As subsea field umbilical arrays grow ever more complex then the integrity of the components becomes increasingly critical.
C-Kore is designed to provide assurance to field installation engineers that their umbilical systems will meet the client requirements by checking electrical integrity immediately prior to connector make-up.
For further information visit our website or call our sales team on 01653 602020
Zetechtics Ltd
Tel: +44 (0) 1653 602020 | Web: www.zetechtics.com oedigital.com June 2013 | OE 17 017oe_0613_Global Briefs.indd 17 5/27/13 3:44 PM