Page 14: of Offshore Engineer Magazine (Jul/Aug 2013)
Read this page in Pdf, Flash or Html5 edition of Jul/Aug 2013 Offshore Engineer Magazine
A
Global Briefs
A
US$200 million for ini-
Exxon, Rosneft tial research. Rosneft and establish ARC
Rosneft and ExxonMobil ExxonMobil will equally signed agreements establish- fund the next $250 million
B ing a joint Arctic Research to continue their joint work
Center (ARC) in Russia at the ARC. Rosneft holds
D and technology-sharing to 66.67% and ExxonMobil
E support their joint ven- holds 33.33%. tures worldwide. ARC will
B provide research, develop-
Noble’s Gunfint fnd
C ment, and technical services, Noble Energy announced
G with a near-term focus on a non-commercial discov-
F the Kara Sea. ARC staff will ery at its second deepwater be in Moscow with the joint Gunfint appraisal well in venture teams. the US Gulf of Mexico. The
Initial activities include Mississippi Canyon 992 #1, structure. The well will work on safety and envi- located one mile west of the be suspended for future
C ronmental protection, ice, original discovery well, was use. Noble Energy operates Peru launches metocean and geotechnical drilled to 32,800ft TD in Gunfint with 31.14% WI. Its offshore round surveys, sea ice manage- 6100ft of water and encoun- partners include Ecopetrol Peru’s international bid ment, design criteria, and tered 109 ft of net pay. America Inc. (31.5%), round will offer offshore evaluation and design of Reservoir data suggests an Marathon Oil Co. (18.23%), blocks Z-56 and Z-57 (Cuenca development concepts. estimated gross resource of and Samson Offshore, LLC Salaverry-Trujillo); Z-53,
ExxonMobil will provide 65-90MMboe in the primary (19.13%). Z-54, and Z-55 (Lima-Pisco
Powerful jumper and umbilical monitoring
As subsea field umbilical arrays grow ever more complex then the integrity of the components becomes increasingly critical.
C-Kore is designed to provide assurance to field installation engineers that their umbilical systems will meet the client requirements by checking electrical integrity immediately prior to connector make-up.
For further information visit our website or call our sales team on 01653 602020
Zetechtics Ltd
Tel: +44 (0) 1653 602020 | Web: www.zetechtics.com
OE | July 2013 oedigital.com 16 oe_0713_Global Briefs.indd 16 6/25/13 12:29 AM