North Sea platform projects

Project / shelf Operator Topsides Jacket Notes

UK Continental Shelf

EPIC - North Sea

Cygnus (gas) GDF Suez E&PProcess and utilities module, two wellhead Four jackets and piles (total Cygnus Alpha modules, compression module with bridges weight 8000-tonne), BiFab, (three platforms) and other structures, Heerema Fabrication Methil, Scotland. and Cygnus Bravo

Group, Hartlepool. Due March 2014-2015. (one platform)

Leman Shell New 3000-tonne compression platform. Jacket, HSM Offshore, HSM’s largest

HSM Offshore, Netherlands, Quarters and 2013. platform project to utility platform, Bifab, Methil. due out 2014. date.

Clipper Shell 84-person accommodation module, Jacket, Rosetti.

Rosetti, Italy.

Golden Eagle Nexen Wellhead and production, utility and Two 6000-tonne quarters deck, Lamprell, Jebel Ali yard, jackets, HFG, Vlissingen,

Dubai, completion due 2013 and 2014. Netherlands.

140-person accommodation module and fare stack and bridge, Sembcorp SLP (formerly SLP Engineering), Lowestoft, UK, sailaway May 2014.

Solan Premier Oil3500-tonne topside, BiFab, Methil and 8000-tonne jacket, Bifab,

Arnish yards, Scotland, due for foat out Methil.

April 2014.

Mariner Statoil Production, drilling and quarters platform 21,000-tonne jacket, Largest jacket with 50 well slots, Daewoo Shipbuilding and Dragados Offshore, Puerto to be built by

Marine (DSME), South Korea. Real, Sardinia, due out June Dragados.

2015.

Bressay Statoil Contracts yet to be announced – SNC

Lavalin doing FEED as it did for Mariner.

Rosebank Chevron 292m long, 99,750-tonne FPSO, Hyundai n/a

Heavy Industries (HHI).

Clair Ridge BP Drilling and production platform and Two jackets (22,300 and quarters and utility platform, HHI, due to be 9000-tonne respectively), installed 2015. Aker Solutions, Verdal,

Norway. Due to be installed mid-late July, going to print.

Montrose Arbroath Talisman 8500-ton topsides, Heerema Fabrication 5400-tonne jacket, OGN,

Redevelopment Sinopec Group, Zwinjdrecht, Netherlands, due out Tyneside, due out March/

Energy UK April 2015. April 2014.

Forties Alpha Apache Satellite platform, OGN, Tyneside, had been Jacket, OGN, sailed away due out 2012. Sailed out May 31. August 2012.

Britannia ConocoPhillips Long term compression module, Wilton n/a

Engineering, Teesside. Due to complete summer 2013.

Elgin B and West Total Production topsides for the Elgin B and Saipem, already installed.

Franklin West Franklin platforms, Rosetti, Italy.

Installation due in July and August.

Fram Shell Shell had approval for an FPSO SBM Offshore had been development but said in January it was working on plans for a unit. reassessing options after drilling results.

Claymore Talisman 1200-tonne compression module, HSM n/a

Offshore, due out in August.

Schiehallion BP FPSO, HHI, South Korea, to be delivered n/a early 2015.

Lomond BG GroupBG put out to tender for a satellite platform, It leaves Dana Petroleum but then cancelled the project. and Serica Energy looking for alternative export solutions for their Arran felds and Columbus development, respectively.

OE | July 2013 oedigital.com 36 034_OE_0713_Epic2_Nsea.indd 36 6/24/13 1:55 AM