Page 48: of Offshore Engineer Magazine (Jul/Aug 2013)
Read this page in Pdf, Flash or Html5 edition of Jul/Aug 2013 Offshore Engineer Magazine
Join us for the 9th Annual Deepwater Intervention Forum
The premier subsea-technology conference
This year, in addition to case histories and new technologies sessions, we will address our theme with a panel discussion about bridging resource gaps. Operators and Engineering Schools will discuss one of the key challenges facing the industry: how to attract and retain young talent in the subsea technology segment.
Preliminary Agenda th
DAY 1 Tuesday, August 13
Opening Night Reception
Hospitality Lounge @ San Luis
WORKSHOP
In Exhibit Hall 5:00-7:00pm 7:00-9:00pm 1:00-5:00pm
Planning, Preparation and
Sponsored By: Sponsored By:
Execution of Well Intervention th
DAY 2 Wednesday, August 14
KEYNOTE KEYNOTE 8:00-8:30am 8:30-9:00am
Session I
Designing to Reduce Developing Competency
Training Time in Well Control
CASE
Kevin Cary,
Tyler Schilling,
HISTORIES
General Manager
President/General Manager 9:00-10:15am
Chevron
FMC Schilling Robotics
Subsea Riserless Light Well Deepwater Riserless Skandi Aker, the First
Intervention to Install Well Intervention Deepwater Intervention
Wireline Retrievable SSSV Vessel
Session II
Ian Still,
Steve Ascroft, Sebastien Bourgin,
NEW TECHNOLOGIES
Blue Ocean Technologies
Anadarko Total 10:45am-12:00pm
Riserless
Light Well Intervention
Neutral Buyoncy Fiber Bragg Grating
Deepwater Subsea
Session III
Lab (FBG) Sensors
Well Decommissioning
Ole Eddie Karlsen,
CASE HISTORIES
Welltec
Frank Sager, Aaron Barr,
Darian HIlton,
Oceaneering Transocean 1:30-3:00pm
Well Ops
Heave-Compensated Tower Well Flow Impacted by
Advanced Well Capping Operation Using a
Enables Cost E