Page 23: of Offshore Engineer Magazine (Sep/Oct 2013)

Read this page in Pdf, Flash or Html5 edition of Sep/Oct 2013 Offshore Engineer Magazine

Global Briefs

Islands, the ships will oper- ate on charter to Gazprom a bypass for the island’s main pipeline and Statoil.

to the mainland. The pipeline supplies 60% of Jakarta’s gas requirements.

R Lundin swaps

Hallin will provide full saturation-diving for CVII PSC

Ullswater services using the subsea

Lundin Sareba BV and Indo- operations vessel. Also on site will be nesia’s SKKMigas entered

Carlisle

Hallin’s , which was recently into a PSC for 100% inter- mobilized for duty as a diving support est in the Cendrawasih VII vessel. (CVII) block off northeastern

Hallin teams will be performing con-

Indonesia. The block is a sub- crete coating removal on existing pipe-

Hallin’s modular saturation diving system on the situte for Lundin’s existing lines, pipeline integrity checks, spools

Carlisle will be used to support dive teams.

Sareba acreage, since Sareba installation, precommissioning assis-

Q was declared a protected Pipeline work off Java tance, installation of hot-taps at multiple nature conservation area.

Hallin Marine was awarded a project off north- locations, and the ftting of underwater

The CVII block covers west Java for installation of new control taps and pipe-closure stopples.

5545sq km and has been

S lightly explored. It contains be 900mt, Huisman-built, Heavy-lift installed as part of the the shallow water portion of heavy-lift mast cranes. The

Cape Lambert port expansion vessel for BigLift the Mamberamo delta and BigLift Shipping’s new his voyage cranes have a lifting height

Phase B project. T an undeveloped gas discov- vessel Happy Sky, is the frst of four consecu- of 40.9m above the main ery in Pliocene turbidite started its maiden voy- tive shipments. deck. reservoirs. Large carbonate age from Shanghai to The vessel is the latest The vessel is 155m long, build-ups have also been Cape Lambert, Australia. 18,680dwt, and has Finnish/ addition to BigLift Shipping’s identifed with a 950sq km The vessel is transport- heavy-lift vessel feet. It was Swedish 1A Ice Class nota- 3D seismic survey acquired ing three large modules built by Larsen & Toubro tion. During sea trials it in 2009. —935mt/818mt/777mt —to in India and features two achieved 17kt service speed.

A leading designer and manufacturer of bespoke metering, hydraulic control systems and produced water treatment solutions

Stand #C60

Metering Produced

Manufacturer Water Treatment

Hydraulic Systems Customer

Manufacturer Service

Wickwar • Aberdeen • Great Yarmouth • Dubai • Dammam • Moscow • Singapore www.alderley.com oedigital.com September 2013 | OE 25 022_OE0913_Global Briefs.indd 25 8/18/13 8:14 PM

Offshore Engineer