Page 96: of Offshore Engineer Magazine (Sep/Oct 2013)
Read this page in Pdf, Flash or Html5 edition of Sep/Oct 2013 Offshore Engineer Magazine
300m for Smørbukk. design and manufacture
Manufacturing is of a DEH system for the expected to start at subsea pipelines serving
Halden next year, with Chevron’s Lianzi oil feld
Subsea delivery anticipated development, located during 2015. in a unitized offshore
Nexans also won a zone between Congo €16 million contract and Angola, off western with Statoil last year to Africa. The Lianzi felds engineer and supply a tie back to the Benguela 16.5 km subsea power Belize Lobito Tomboco umbilical that will be (BBLT) platform in used to connect the Angola Block 14. With
Gullfaks C platform to a water depth between the new compression 390-1,070m, this will be facility. Additionally, the world’s deepest DEH
Nexans has a 10-year system. The cables are
The Halden plant includes a 121m-high extrusion tower.
global frame agreement due for delivery during in place with BP to supply umbilicals, own electrical resistance. By control- the summer of 2014.
direct heating systems, accessories and ling the current, the pipeline’s inner The contract with Subsea 7 cov- services for various oil and gas proj- wall can at all times be maintained ers the delivery of a complete DEH ects worldwide. The agreement runs above the critical temperature for wax system, including DEH riser cable, from 2012 to 2022. and hydrate formation. Over the past armored feeder cable, a 43km-long pig-
A niche offshore market for Nexans 15-20 years, Nexans has supplied 19 gyback cable, and all associated acces- is direct electrical heating (DEH). out of the 20 pipelines operating with sories for connection to the pipeline
Alternating current transmitted from DEH systems. that will join the Lianzi development the DEH cable runs through the steel A new €25 million offshore order for project subsea facilities with the BBLT def tracciati copy.pdf 1 26/07/13 13.04 in the pipe, which heats due to its Halden has come from Subsea 7 for the platform.
C
Magnum Long Range™
M
Y
CM
MY
CY
CMY
ALWAYS SMARTER.
K
Magnum specializes in designed-for-purpose plugs for any completion environment— whether onshore or off.
Frac plugs shouldn’t be an engineering afterthought.
That’s why every Magnum plug is precision-engineered for specifc downhole environments. Whatever the application, don’t trust your completion to just any thrown-in plug.
Learn more at www.always-smarter.com
OE | September 2013 oedigital.com 98 000_OE0913_Subsea_cablesNexan_v2.indd 98 8/19/13 8:10 AM