Page 100: of Offshore Engineer Magazine (Oct/Nov 2013)
Read this page in Pdf, Flash or Html5 edition of Oct/Nov 2013 Offshore Engineer Magazine
Numerology of 7000 platforms around the world have been in operation more than 20 years. See page 24.
30%
The life-of-feld date for Shell’s Mars development. See page 70.
2050
The drilling depth of Parker’s inland barge Rig 257. See page36.
30,000 ft The number of lightning strikes per second that occur globally, according to the US National Weather Service. See page 48.
100
The amount Eni will spend to drill in the Timor Sea over the next 18 months.
US $230million See page 14.
The length of subsea array cables produced by
JDR Cable Systems in Hartlepool in 2011 for wind 200 km farms of England. See page 52.
of ofshore pipelines are expected to be installed over the next fve years See page 66.
32,000km
New world record for freefall lifeboat drop. (Source: Norsafe ASA) Watch the video on OEdigital.com 66.8m
The lifting capacity of a pedestal crane, as tons defned by the US Coast Guard See page 72.
5
OE | October 2013 oedigital.com 102 140_OE0913_Num.indd 102 9/29/13 11:36 PM