Page 31: of Offshore Engineer Magazine (Oct/Nov 2013)
Read this page in Pdf, Flash or Html5 edition of Oct/Nov 2013 Offshore Engineer Magazine
0ft 750ft
LOCATION LOWER TERTIARY GULF OF MEXICO
FACILITY FIRST FPSO IN GULF OF MEXICO 1500ft
DEPTH 8,887 FT / 2,740 M
PRESSURE 19,000 PSI 2250ft
TEMPERATURE 250°F 3000ft
SERVICE HP/HT SOUR ENVIRONMENT
CASCADE AND CHINOOK 3750ft 4500ft 5250ft
THIS IS NO PLACE 6000ft
TO COMPROMISE.
Ultra deepwater ? elds like Cascade and Chinook require the highest levels of experience, technology and 6750ft environmental care. On every count, Tenaris delivered. Expertise gained in extreme offshore environments around the world. Quality manufactured line pipe products. Exceptional R&D that leads to better solutions.
That’s why more operators turn to Tenaris.
7500ft 8250ft
Quality that makes the difference.
9000ft ten100_oe_pipeline_ad_0822.indd 1 8/22/12 4:47 PM