Page 27: of Offshore Engineer Magazine (Jan/Feb 2014)
Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2014 Offshore Engineer Magazine
MULTIZONE COMPLETIONS
Enhanced multizone completion saves considerable time and cost.
Case History:
OPERATOR CHALLENGE –
Frac Pack Multiple Zones Offshore
Reservoirs in ultra-deep water required stimulation. Stacked, multizone completions negatively impacted economics.
HALLIBURTON SOLUTION
The Enhanced Single-Trip Multizone (ESTMZ™) system with pump rates up to ? ve times the rate of older systems. It can pump at rates up to 45 barrels per minute while increasing differential pressure and proppant volume.
SOLUTION RESULTS
A total savings of on average 18 days per well
COMPLETE on three ultra-deepwater Chevron-operated
WITH wells in the Gulf of Mexico Lower Tertiary.
LEADER.
THE
Impressive results. Even for the completions What’s your multizone completions challenge?
leader worldwide. For Chevron’s wells in the GoM, ™ the ESTMZ system for multizone completions really
To learn more, visit: added up to major savings. Plus the industry’s highest
Halliburton.com/ pumping capability combined with risk reduction to the wellbore and topside personnel are all signi? cant
Complete1 reasons to complete with the leader.
™
Solving challenges.
© 2013 Halliburton. All rights reserved.
JANUARY-1.indd 6 12/19/13 3:05 PM