Page 6: of Offshore Engineer Magazine (Mar/Apr 2014)
Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2014 Offshore Engineer Magazine
THE MOMENTUM IS BUILDING
CAMERON’S TOTAL RIG PACKAGE SOLUTIONS
FLOW EQUIPMENT LEADERSHIP
Cameron: Number One Installed Base
TOTAL RIG PACKAGE HIGHLIGHTS of Jackup Rigs in the World.
• Advanced Drilling Controls • Automated Pipe Handling
At Cameron, our legacy of leadership spans decades and continents. With more than 140 rigs • BOP: Up to 25,000 psi in operation, we have the largest installed base of jackup rig designs in the world today. • Innovative Mud Handling Solutions
This heritage of being number one dates back almost 60 years to when we introduced the • 30,000+ ft. Drilling Depth
Scorpion – the industry’s ? rst mobile offshore platform. Building on this success, Cameron continues to offer a wide range of reliable rig designs.
Established. Reliable. Innovative. That’s the power of Cameron’s Total Rig Package Solutions.
Learn more at: www.TheMomentumIsBuilding.com
RAISING PERFORMANCE. TOGETHER™
CAMER-1258_Drilling_OffshoreEng_0214.indd 1 2/14/14 5:16 PM
March-1.indd 14 2/17/14 3:47 PM