Page 135: of Offshore Engineer Magazine (May/Jun 2014)
Read this page in Pdf, Flash or Html5 edition of May/Jun 2014 Offshore Engineer Magazine
Subsea systems lifting apparatus
Pelicano 1
Main highlights of upgrade
VesselsVessels program:
Although not directly related to the top- Installation of two azimuthing thrusters • side module integration, it is interesting 200MT+ of steel plates re newed in the of c. 2500BHP (ea) • to understand how some of the modules vessel’s hull Replacement of all four diesel generators • will be connected to the production and Special Survey completed hilst Replacement of out-dated electrical • • injection wells at the Sapinhoá ? eld. indry-dock cables and switch boards
Technip was awarded by Petrobras an ABS Class certi? cate valid for next ? ve Installation of state-of-the-art • • ultra-deepwater contract for the supply years instruments to aid in the operation of the of ? exible pipes for the Sapinhoá Norte Replacement of all wire ropes, including crane barge • • In addition to quicker operations, ? eld, at a water depth of up to 2500m. lu