Page 3rd Cover: of Offshore Engineer Magazine (May/Jun 2014)

Read this page in Pdf, Flash or Html5 edition of May/Jun 2014 Offshore Engineer Magazine

WHEN CONDITIONS

MAXIMUM LOAD 10,000 KG

ARE AT THEIR WORST,

WE’RE AT

OUR BEST

DECK LOAD

PLATFORM POSITION 5 KPA

LATITUDE: 56° 10’ 24.2677”

LONGITUDE: 01° 08’ 55.1789”

CELLAR DECK

R.L 123 M

SIG. WAVE

HEIGHT: 12.5 M

Offshore projects are more complex and demanding than ever. The future is farther out and deeper below, and the challenges that go with it are forcing engineers to work smarter, safer, and more productively. Bentley’s comprehensive offshore solution, supported by the integration of industry standards SACS, MOSES, and MaxSurf, provides unprecedented control and advanced analysis, design, and simulation capabilities for even the most challenging projects.

BENTLEY OFFSHORE. NOTHING IS STRONGER AT SEA.

Get the whole story of Bentley’s comprehensive solutions for offshore: www.bentley.com/OE © 2014 Bentley Systems, Incorporated. Bentley, the “B” Bentley logo, SACS, MOSES, and MAXSURF are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated or one of its direct or indirect wholly owned subsidiaries. Other brands and product names are trademarks of their respective owners.

april-1.indd 31 4/15/14 10:42 AM 5208_Ad_Offshore_Conditions_ATCO_8-125x10-875_0114.indd 1 2/7/2014 3:00:04 PM

Offshore Engineer