Page 29: of Offshore Engineer Magazine (May/Jun 2014)
Read this page in Pdf, Flash or Html5 edition of May/Jun 2014 Offshore Engineer Magazine
Analysis
Rig stats
Worldwide
Rig Type Total Rigs Contracted Available Utilization
Drillship 98 92 6 93%
Jackup 413 361 52 87% 192 171 21 89%
Semisub 32 22 10 68%
Tenders 735 646 89 87%Total
Gulf of Mexico
Rig Type Total Rigs Contracted Available Utilization
Drillship 22 21 1 95% objections because they (BOEM) put in a few new things about 94 82 12 87%Jackup marine mammals that were deleterious to our work.” 30 28 2 93%
Semisub
Some concerns were focused on active acoustic sound
N/A N/AN/A N/A
Tenders sources from airguns and electromechanical sources; vessel 146 131 15 89%
Total and equipment noise; vessel traf? c; aircraft traf? c and noise;
Asia Paci? c vessel exclusion zones; trash and debris; sea? oor disturbance;
Rig Type Total Rigs Contracted Available Utilization drilling discharges; and accidental fuel spills.
Drillship 15 13 286%
Andy Radford, a senior policy advisor with American
Jackup 115 101 14 87%
Petroleum Institute (API); Sarah Tso? ias, a former vice 36 31 586%
Semisub president for Marine Environment with the International
Tenders 23 15 8 65%
Association of Geophysical Contractors (IAGC); and Luke
Total 189 160 29 84%
Johnson, former policy director with the National Ocean
Latin America
Industries Association (NOIA) advise that additional methods
Rig Type Total Rigs Contracted Available Utilization be included within the PEIS, in order to emphasize the risks
Drillship 28 27 196% affecting different species in the Atlantic region.
Jackup 9 6 366% “We strongly encourage that both the range of alternatives 42 41 1 97%
Semisub analyzed and their evaluation re? ect the nature and extent
Tenders 2 2 0100% of the known causes of injury and mortality faced by various
Total 81 76 5 93% protected species,” the respresentatives said.
Northwest European Continental Shelf “In addition, we oppose several of the mitigation measures
Rig Type Total Rigs Contracted Available Utilization proposed as part of Alternative A. We believe that Alternative
Drillship 1 1 0100%
B is unwarranted for a number of reasons including the ? nding
Jackup 47 42 5 89% in the DPEIS that doubling the size of the closure area does not
Semisub 46 44 2 95% provide additional protection for Right whales or marine life
N/A N/AN/A N/A
Tenders generally.” 94 87 7 92%
Total
In February 2014, BOEM published a ? nal environmental review of G&G activities off the Atlantic coast, specifying
Middle East & Caspian Sea
Rig Type Total Rigs Contracted Available Utilization mitigation efforts, which include requirements to avoid vessel
Drillship 1 1 0100% strikes, special closure areas to protect the main migratory route
Jackup 101 85 16 84% for the endangered North Atlantic Right Whale, geographic 3 3 0100%
Semisub separation of simultaneous seismic airgun surveys, and passive
N/A N/AN/A N/A
Tenders acoustic monitoring (PAM) to supplement visual observers 105 89 1684%
Total and improve detection of marine mammals prior to and during seismic airgun surveys.
Sub-Saharan Africa “Analysis of this scale is a signi? cant undertaking that has
Rig Type Total Rigs Contracted Available Utilization
Drillship 30 28 2 93% involved extensive public input and coordination among 24 22 2 91%
Jackup several federal agencies and state governments,” said BOEM 19 15 4 78%
Semisub
Director Tommy P. Beaudreau. “The Department and BOEM 7 5 2 71%
Tenders have been steadfast in our commitment to balancing the need 80 70 10 87%Total for understanding offshore energy resources with the protection of the human and marine environment using the best available
Rest of the World science as the basis of this environmental review.”
Rig Type Total Rigs Contracted Available Utilization
The Final PEIS was available for public comment until 7
Drillship 1 1 0100%
Jackup 23 23 0100%
April 2014. After reviewing the comments, the BOEM will issue
Semisub 16 9 7 56% of a Record of Decision (ROD), which will state the decision of
Tenders
N/A N/AN/A N/A the agency; identify the alternatives considered, including the
Total 40 33 782% environmentally preferable alternative; identify and discuss
Source: In? eldRigs the factors involved in the decision; and will state whether all 9 April 2014 practical means to avoid or minimize environmental harm have
This data focuses on the marketed rig ? eet and excludes assets that are under construction, retired, destroyed, deemed non-competitive or cold stacked.
been adopted.
oedigital.com May 2014 | OE 31 000_OE0514_Analysis2_BOEM.indd 31 4/18/14 6:40 PM