Page 16: of Offshore Engineer Magazine (Jun/Jul 2014)

Read this page in Pdf, Flash or Html5 edition of Jun/Jul 2014 Offshore Engineer Magazine

completed its largest subsea production at its 100%-owned intends to develop the ? eld Petronas’ approval for the pipeline pressure intervention Kenli 3-2 oil? elds, the com- off the coast of the Malaysia’s Bertam ? eld development to date offshore Indonesia. pany announced on 12 May Sarawak state on Borneo, and plan in October 2013.

The scope of work included 2014. The Kenli 3-2 oil? elds, start production with an FPSO

T

Nereus ROV lost in hot tap and plugging opera- located in the southern Bohai in 2Q 2016. Layang ? eld is

Kermadec Trench off NZ tions, which were carried out Sea at an average water depth about 8km east of the produc-

Hybrid remotely operated for main contractor Timas of 20m, include Kenli 3-2, ing Helan gas ? eld, in Block vehicle (ROV) Nereus was

Suplindo in conjunction Bozhong 34-6/7, the southern SK10. JX Nippon anticipates con? rmed lost at 9990m with Offshore Construction part of Bozhong 29-4 and the initial production of 100 depth in the Kermadec

Specialists, on behalf of Bozhong 35-2 oil? elds. The Mcf/d of natural gas (17,000

Trench northeast of New

Pertamina EP. Work was primary production facili- boe/d) and about 7000 b/d of

Zealand. The unmanned vehi- performed on sections of the ties include seven offshore condensate and crude.

cle was working as part of a pipeline network attached platforms and one onshore

S

Drilling at Bertam off mission to explore the ocean’s to part of the Lima ? ow oil processing terminal. Peak

Malaysia set to start hadal region from 6000m station as part of the subsid- production is expected to hit to nearly 11,000m deep. ence remediation project. 35,000b/d. In March, CNOOC Lundin Malaysia BV will

Scientists say a portion of it

The ? ow station consists of announced a natural gas dis- begin development drill- likely imploded under pres- compression, service and covery in the nearby Bozhong ing at its Bertam oil ? eld

Classroom_in_a_box_ad_Layout 1 14/02/2013 10:36 Page 1 sures reaching 16,000psi. At process platforms, as well as 22-1 structure in south central off peninsular Malaysia this the time it was lost, the ROV a platform bridge, ? are bridge Bohai. Gas production tested summer. The Bertam ? eld, was 30 days into a 40-day and tower. The overall goal is at 14.2MMcf/d. in the PM307 Block, was expedition with R/V Thomas to raise the Lima ? ow station, discovered in 1995 when

R

Japan’s JX to develop

G. Thompson to carry out in the northwestern Java Sea, Petronas Carigali drilled

Layang ? eld with FPSO the ? rst systematic study of a which has been sinking into the Bertam-1 well. Lundin deep-ocean trench as part of a the seabed for 17 years. Malaysia’s Petronas has Petroleum acquired the approved Japan’s JX Nippon PM307 license block in 2011, program under chief scien-

Q

CNOOC begins

Oil & Gas Exploration’s ? eld and Lundin Malaysia com- tist Timothy Shank, a WHOI

Kenli 3-2 production development plan for the pleted the Bertam-2 appraisal biologist who also helped

CNOOC Ltd. began Layang gas ? eld. JX Nippon well in 2012. Lundin received conceive the vehicle.

Classroom in a boxabox

CERTIFIED JUPITER TRAINING FROM ZETECHTICS

At Zetechtics we understand the need for engineers and technicians to have the knowledge and expertise to operate, develop and maintain our products. As part of our commitment to providing the highest quality training, we have recently invested in a suite of training aids including our ‘classroom in a box’ ensuring the highest standards are delivered throughout the world.

Zetechtics LtdZetechticsLtd

Tel: +44 (0) 1653 602020 | Web: www.zetechtics.com

June 2014 | OE oedigital.com 18

For more information about our training courses visit our 000-OE0614_GlobalBriefs.indd 18 5/22/14 10:03 PM website or contact us on +44 (0)1653 602020

Offshore Engineer