Page 80: of Offshore Engineer Magazine (Jun/Jul 2014)

Read this page in Pdf, Flash or Html5 edition of Jun/Jul 2014 Offshore Engineer Magazine

Numerology

The production rate, in bo/d, of Petrobras’ P-62 .

FPSO, located in the Campos basin. See page 16 180,000

The payload capacity of Robotic Drilling Solutions’ prototype fully-electric robot. See page 34.

1500 kg is the low end of the temperature range in which gas sensors can operate. See page 30.

-40 °C are projected to be installed between 2014-2018, Douglas-Westwood projects. 139 FPUs See page 66.

The percentage of oil recovered from a reservoir, according to the US

DOE. See page 46.

20-40 is the total amount of crude oil produced worldwide. is the total amount of crude oil produced worldwide. 75 See page 50.

MMbo/d are estimated to be currently operating (Source: O

Offshore Engineer