Page 80: of Offshore Engineer Magazine (Jun/Jul 2014)
Read this page in Pdf, Flash or Html5 edition of Jun/Jul 2014 Offshore Engineer Magazine
Numerology
The production rate, in bo/d, of Petrobras’ P-62 .
FPSO, located in the Campos basin. See page 16 180,000
The payload capacity of Robotic Drilling Solutions’ prototype fully-electric robot. See page 34.
1500 kg is the low end of the temperature range in which gas sensors can operate. See page 30.
-40 °C are projected to be installed between 2014-2018, Douglas-Westwood projects. 139 FPUs See page 66.
The percentage of oil recovered from a reservoir, according to the US
DOE. See page 46.
20-40 is the total amount of crude oil produced worldwide. is the total amount of crude oil produced worldwide. 75 See page 50.
MMbo/d are estimated to be currently operating (Source: O