Page 17: of Offshore Engineer Magazine (Jul/Aug 2014)

Read this page in Pdf, Flash or Html5 edition of Jul/Aug 2014 Offshore Engineer Magazine

Contract BriefsContract Briefs

Caril. The contract is expected supply of inspection services Australia at a US$430,000 to begin 3Q 2015 and has an to the platform in the day rate. BHP Billiton retains

GOM win for Subsea 7GOM win for Subsea 7 Goliat

Freeport-McMoRan Oil & Gas estimated backlog of US$1.3 Barents Sea. The term of the the right to further extend the awarded Subsea 7 a contract billion. contract is three years, with an contract for two option periods worth more than US$50 mil- option for a two-year exten- of about 120 days each at the lion in support of the Gulf of sion. The assignment consists same rate.

Oceaneering snags

Mexico’s KOQV and Holstein of planning and carrying out umbilicals contract

Deep ? elds. The work scope Oceaneering secured a con- inspections of static equipment,

Wood Group wins Shah covers the installation of ? exible tract from FMC Technologies load-bearing structures and

Deniz 2 contract pipelines and umbilicals for Singapore to supply umbili- the o

Offshore Engineer