Page 73: of Offshore Engineer Magazine (Sep/Oct 2014)
Read this page in Pdf, Flash or Html5 edition of Sep/Oct 2014 Offshore Engineer Magazine
ROV BOP intervention to API 53 standards:
We’ve got the power.
Schilling Robotics’ new UHD-III ROV with integrated ISOL-8 Pump is the only ROV powerful enough to meet API 53 guidelines for BOP emergency override. All by itself.
At 250-horsepower, it’s the most powerful and versatile ROV ever made for subsea construction, IRM and drill support operations.
It’s the ROV you’ve been waiting for. And you don’t have to wait any longer.
Copyright © FMC Technologies, Inc. All Rights Reserved.
www.fmctechnologies.com
September.indd 16 8/19/14 10:05 AM
Pub/Issue Offshore Engineer_September Size B: 8.5 x 11.125 T: 8.125 x 10.875 L: 7 x 10 File Name ROV Client FMC