Page 46: of Offshore Engineer Magazine (Oct/Nov 2014)
Read this page in Pdf, Flash or Html5 edition of Oct/Nov 2014 Offshore Engineer Magazine
a rig, you can actually print a connec- tor, put the connector in front of the
Worth 1000 words guys, disassemble it, and give them their
EPIC tool that triggers clear communication, instructions.
By Sarah Musarra Parker
For rig crews sitting miles away from along with serving as a manipulatable “They’ve got their manual and their the coastline – and sometimes on the model that allows for employees be model.” other side of the globe from their home exposed to large equipment quickly, easily However, while Calnan is pleased to see o