Page 14: of Offshore Engineer Magazine (Dec/Jan 2014)
Read this page in Pdf, Flash or Html5 edition of Dec/Jan 2014 Offshore Engineer Magazine
M
KPOC celebrates frst
Asia Ltd. each holding a 30% the structure will stand 110m located in the Browse basin
Kebabangan gas interest with Petronas Carigali off the seabed. The completed in WA-424-P in 75m water
The KPOC joint venture Sdn Bhd (40%). RSS will be a physical, fxed depth. The Stena Clyde achieved frst gas from the The Kebabangan cluster support for fexible risers and semisubmersible drilling rig
Kebabangan gas feld, approxi- asset comprises four non-asso- dynamic umbilicals. reached a total depth of 694m, mately 60 mi offshore Sabah, ciated gas felds: Kebabangan, The Ichthys LNG project is where no moveable hydrocar-
Malaysia. Kamunsu East, Kamunsu East scheduled to begin produc- bons were encountered.
KPOC is drilling Upthrown, and Kamunsu East tion at the end of 2016. It IPB says despite some resid-
Kebabangan with Jamstec’s Upthrown Canyon, located will have an initial capacity ual oil shows encountered deepsea vessel CHIKYU in in water depths ranging from to produce 8.4mtpa of LNG, while drilling, the target res- about 450ft water depth. 120-1200m, about 125km off 1.6mtpa of liquefed petro- ervoir at Pryderi is interpreted
Production scheduled to the Sabah coast. leum gas, and approximately to be water-bearing. Further begin as pipeline capacity 100,000b/d of condensate at analysis is pending.
N
Ichthys LNG becomes available, which will peak production.
P gets RSS tower Rosneft completes initially use six wells with gas Inpex operates the Ichthys
East Siberia seismic exported using pipeline to the The Inpex-operated Ichthys project with 66.7% interest
Sabah Oil and Gas Terminal LNG project is moving for- with partners Total (30%), Rosneft concluded seismic in Kimanis. ward with the installation of Tokyo Gas (1.575%), Osaka data acquisition on the East-
ConocoPhillips is expect- a 6500-tonne riser support Gas (1.2%), Chubu Electric Siberian-1 Block in the off- ing to add approximately structure (RSS) tower at the Power (0.35%), and Toho Gas shore area of the East Siberian 60,000boe/d to its production Ichthys Field. The deepwater (0.42%). Sea. The company carried out volumes by 2017 with project construction vessel Aegir con- the seismic data survey inde-
O
Pryderi-1 comes up startups in Malaysia. The ducted installation operations pendently with R/V Orient dry in Browse Basin company’s overall plan is to at the Ichthys feld, located in Explorer, with the amount deliver an annual 3-5% pro- the Browse basin, off Western CalEnergy’s Pryderi-1 well of 2D work totaling 2000km. duction and margin growth. Australia. off Australia will be plugged All work was carried ahead
The feld is operated by According to Inpex, the and abandoned as a dry hole, of schedule. The geologic
KPOC, a joint operated com- RSS is the largest subsea according to joint venture data acquisition was imple- pany with ConocoPhillips structure ever laid on the sea- partner IPB Petroleum. mented by Rosneft subsidiary
Sabah Ltd. and Shell Energy bed. When the arch is placed, The exploration well is RN-Shelf-Far East.
Quality & reliability you can count on
Subsea Control Systems
Zetechtics are well known for quality & reliability and with clients demanding greater accuracy & repeatability (when controlling hydraulic tooling at depth), our Jupiter range of control systems certainly deliver and frequently exceed our customer expectations.
Subsea Sensors & C-Kore Umbilical &
Display Systems Jumper Monitoring
Zetechtics manufacture a wide range of battery C-Kore is designed to provide assurance to feld powered subsea sensors that can be ftted installation engineers that their umbilical system to subsea equipment for client applications, will meet the client requirements by checking sensor range includes: accurate pressure gauge electrical integrity before, during and if monitoring, valve actuation counters, simple on/ required after installation.
off sensor state monitoring and the latest dual display measuring both torque and turns or volume and flow.
Tel: +44 (0) 1653 602020 www.zetechtics.com
December 2014 | OE oedigital.com 16 014_OE1214_Global Br.indd 16 11/21/14 8:57 AM