Page 62: of Offshore Engineer Magazine (Jan/Feb 2015)

Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2015 Offshore Engineer Magazine

Pipelines

Reel-lay gets real attention stands while offshore. the issues around internal buckling of the

The race has been on to create

Mechanically lined pipe uses a combi- liner during the laying process. a mechanically-lined pipe that nation of carbon steel outer pipe with a “Most projects have been installed by corrosion resistant alloy liner. The CRA S-Lay, followed by Bundle,” says Brigitte can be installed using reel-lay. liner is hydraulically assembled inside Blechinger, Senior Sales Manager Oil

Now it’s been done, and the the carbon steel pipe, creating an interfer- & Gas at BUTTING. “Reeling seems to method is taking o

Offshore Engineer