Page 32: of Offshore Engineer Magazine (May/Jun 2015)
Read this page in Pdf, Flash or Html5 edition of May/Jun 2015 Offshore Engineer Magazine
RELIABILITY
YOU CAN COUNT ON
AVAILABILITY
YOU CAN BANK ON
The Mark IV POD’s improved reliability advances subsea control system availability to guard against costly downtime.
The Mark IV BOP subsea control system has fewer tubing connections to reduce potential leak paths, and when compared to some PODs, the Mark IV is up to 33% lighter. Our POD improvements enabled the development of an optional Mark IV High
Availability (HA) confguration – the industry’s frst three-POD design – that provides the redundancy to eliminate stack pulls if one POD fails, improving operational availability to as much as 98%. The Mark IV’s HA confguration won an Offshore Technology
Conference 2015 Spotlight on New Technology award.
The Mark IV POD will be on display at Cameron’s booth (3317) during this year’s OTC.
Learn more about the award-winning Mark IV HA at: www.c-a-m.com/MarkIVHA
AD01782DRL 000_OE0515_HSEQ.indd 34 4/19/15 5:01 PM