Page 15: of Offshore Engineer Magazine (Jun/Jul 2015)
Read this page in Pdf, Flash or Html5 edition of Jun/Jul 2015 Offshore Engineer Magazine
Contract BriefsContract Briefs the Wintershall Norge-operated installation and permanent
Kongsberg wins
Maria ? eld. anchoring of two rigid produc-
FPSO contract
Aibel’s scope of work entails tion ? owlines of 3.25km each Kongsberg Maritime entered Wood Group wins increasing the water injec- with four pipeline end termina- into a US$26.5 million contract
OSRCL work tion capacity of Heidrun and tions; pre-commissioning and to supply a complete electrical,
Wood Group Kenny (WGK) perform the tie-in of the water testing. instrument and telecom solu- won a ? ve-year contract with injection from the platform to The o