Page 32: of Offshore Engineer Magazine (Aug/Sep 2015)

Read this page in Pdf, Flash or Html5 edition of Aug/Sep 2015 Offshore Engineer Magazine

more than 300km of subsea pipelines and turret, a dual-rack cabinet for the operat- merged with the seismic data. The ? rst umbilicals. ing system and data storage in the main monitor survey was acquired within 30 equipment room. The seismic system can days and achieved good repeatability with

Cost-e

Offshore Engineer