Page 99: of Offshore Engineer Magazine (Sep/Oct 2015)

Read this page in Pdf, Flash or Html5 edition of Sep/Oct 2015 Offshore Engineer Magazine

Photos from Dockwise.

“For me, this is an innovation, a frst,” he are 10 times more expensive than the dry 2016, with possibly another job in-between. says. “We are able to show to the market this tow alternative, showing that insurance com- To accommodate the , a vessel

Moho Nord is a better, faster, more efcient solution to panies recognize that dry transport is a safer wider than the , Dockwise had been

Intrepid transport ship-shaped FPSOs from one side solution, says Hans Leerdam, category man- considering removing one of the aft casings, of the world to another, be it for reftting or ager, strategic vessels, Boskalis Ofshore. for the loading, and then reinstalling them. new builds. The alternative is a wet tow – at The , with the The frm is now planning a permanent solu-

Dockwise Vanguard half the speed. We expect the on board, arrived in Batam, tion, which will mean moving the vessel’s

Dockwise Armada Intrepid

Vanguard to cruise up to 12 knots. Wet tow Indonesia, 8 July, having sailed via the Cape aft casings further apart, on permanent out speed is about 6-8 knots. You can also be of Good Hope, without the need for tugs and riggings, to make the slot big enough for the more fexible, going around bad weather. You in less time than a wet tow would have taken. , and other similar wide-beam

Moho Nord are safer and more in control.” Now Dockwise is preparing the units, to foat in across the stern, like the

Dockwise

In fact, insurance premiums for wet tows to transport the , in 1Q , Leerdam says.

Vanguard Moho Nord Intrepid •

Experience the oil and gas industry like you never have before!

PRODUCTION

EXPLORATIONEXPLORATION

TITLE DEED

PEMEX

HALLIBURTON

RENT $35

RENT $25RENT $25

With 1 Jackup $175

With 2 Jackups $500With 2 Jackups $500

If 2 field developments are owned $50 field developmentsare owned $50

With 3 Jackups $1100With 3 Jackups $1100

If 3 field developments are owned $100 field developmentsare owned $100

With 4 Jackups $1300

If 4 field developments are owned $200d developmentsare owned $200

With Platform $1500

Mortgage Value $175Mortgage Value $175

MORTGAGE VALUE – $100MORTGAGE VALUE – $100

Jackups cost $200 eachJackups cost $200 each

NATIONAL OILWELL VARCO

Platforms, $200 eachPlatforms, $200 each © 1935, 2015 HASBRO. © 2015 Offshore Engineer© 1935, 2015 HASBRO. © 2015 Offshore Engineer© 1935, 2015 HASBRO. © 2015 Offshore Engineer plus 4 Jackups

SPE

RENT $25

If a player owns all the sites of any color group,If a player owns all the sites of any color group, the rent is doubled on unimproved sites in that group.the rent is doubled on unimproved sites in that group.

If SPE is owned, © 1935, 2015 HASBRO. © 2015 AtComedia, LLC© 1935, 2015 HASBRO. © 2015 AtComedia, LLC

If 2 field developments are owned $50 rent is 4 times amount shown on dice.

If 3 field developments are owned $100

If 4 field developments are owned $200

If both SPE and IADC are owned, rent is 10 times amount

MORTGAGE VALUE – $100 shown on dice.

Buy today at Stand 3C180

MORTGAGE VALUE – $75 © 1935, 2015 HASBRO. © 2015 Offshore Engineer © 1935, 2015 HASBRO. © 2015 Offshore Engineer

Or order online at: www.atcomedia.com/store/oe-monopoly

Limited quantity available. Buy today!

100_OE0915_DO-6_Dockwise.indd 101 8/21/15 8:42 AM

Offshore Engineer