Page 39: of Offshore Engineer Magazine (Aug/Sep 2016)
Read this page in Pdf, Flash or Html5 edition of Aug/Sep 2016 Offshore Engineer Magazine
Reduce Rig Time and Risk ®
WITH THE EVO-RED BRIDGE PLUG ®
On a typical subsea operation, an Evo-RED bridge plug can reduce wireline runs from eight to one, which can save over 24 hours of rig time. It can be remotely opened and closed without the need for intervention or any control lines to surface, increasing reliability and reducing uncertainty. It also can simplify both intervention and completion applications by removing wireline runs.
Every step of the way, we get results together.
halliburton.com/evo-red © 2016 Halliburton. All Rights Reserved.
OOO_OE0816_Ads.indd 41 7/21/16 11:04 AM