![Logo of Offshore Engineer](https://images.marinelink.com/images/magazines/w100/OffshoreEngineer-201703-page1.png)
Page 47: of Offshore Engineer Magazine (Mar/Apr 2017)
Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2017 Offshore Engineer Magazine
requires tension or pull from the removed. Thus, it is vital to out? t downline to disconnect. Upon an intervention panel with ROV this occurring, the connector paddle valves and a hot stab, with a large bore, to remove hydrates instantaneously seals at both the male and female end, ensuring at an e