
Page 5: of Offshore Engineer Magazine (Jul/Aug 2019)
Subsea Processing
Read this page in Pdf, Flash or Html5 edition of Jul/Aug 2019 Offshore Engineer Magazine
by the numbers
New York: 118 E. 25th St., New York, NY 10010 tel: (212) 477-6700; fax: (212) 254-6271
Florida: 215 NW 3rd St., Boynton Beach, FL 33435 tel: (561) 732-4368; fax: (561) 732-6984
RIGS
PUBLISHER
JOHN O’MALLEY jomalley@marinelink.com
Worldwide Middle East
EDITORIAL
Rig Type Available Contracted Total Utilization Rig Type Available Contracted Total Utilization
GREG TRAUTHWEIN
Drillship 26 63 89 71% Drillship 0 1 1 100%
Associate Publisher & Editorial Director
Jackup 121 314 435 72% Jackup 24 114 138 83% trauthwein@offshore-engineer.com
Semisub 33 73 106 69% North America
ERIC HAUN
Africa Rig Type Available Contracted Total Utilization
Managing Editor
Rig Type Available Contracted Total Utilization Drillship 1 22 23 96% haun@offshore-engineer.com
Drillship 5 13 18 72% Jackup 24 30 54 56%
Jackup 11 23 34 68% Semisub 3 8 11 73%
ELAINE MASLIN, Aberdeen
Semisub 1 3 4 75% maslin@offshore-engineer.com
Oceania Rig Type Available Contracted Total Utilization
Asia
SHEM OIRERE, Africa
Rig Type Available Contracted Total Utilization Drillship 1 0 1 0% oiere@offshore-engineer.com
Drillship 4 7 11 64% Jackup 2 1 3 33%
Jackup 45 90 135 67% Semisub 0 6 6 100%
LAXMAN PAI, India/Asia
Semisub 9 18 27 67% pai@offshore-engineer.com
Russia & Caspian Rig Type Available Contracted Total Utilization
Europe
JENNIFER PALLANICH, Houston
Rig Type Available Contracted Total Utilization Jackup 2 7 9 78% pallanich@offshore-engineer.com
Drillship 13 2 15 13% Semisub 2 4 6 67%
Jackup 9 42 51 82%
CLAUDIO PASCHOA, Brazil paschoa@offshore-engineer.com
Semisub 10 29 39 74% This data focuses on the marketed rig ? eet and excludes
WILLIAM STOICHEVSKI, Oslo
Latin America & the Caribbean assets that are under construction, retired, destroyed, ws@offshore-engineer.com
Rig Type Available Contracted Total Utilization deemed noncompetitive or cold stacked.
Drillship 2 18 20 90%
PRODUCTION & GRAPHIC DESIGN
Jackup 3 7 10 70% Data as of August 7, 2019.
IRINA VASILETS
Semisub 7 5 12 42% Source: Wood Mackenzie Offshore Rig Tracker vasilets@marinelink.com
NICOLE VENTIMIGLIA nicole@marinelink.com discoveries & Reserves
ADVERTISING & SALES
ROB HOWARD, VP Sales
Offshore New Discoveries (561)732-4368 • howard@offshore-engineer.com
Water Depth 2015 2016 2017 2018 2019
Shallow water (1-399m)
MARK GATES, North America
Deepwater 25 13 16 12 2
Deepwater (400-1,499m) (281) 245-1896 • markg@offshore-engineer.com
Shallow water 85 66 72 46 11
Ultra-deepwater (1,500m+)
Ultra-deepwater 20 16 12 17 7
BRENDA HOMEWOOD, Scandinavia/Europe +44 1622 297 123 • brenda@offshore-engineer.com
Offshore Undeveloped Recoverable Reserves
ARTHUR SCHAVEMAKER, The Netherlands/Germany
Water Depth Number Recoverable Recoverable Contingent, good technical, +31 547 27 50 05 • arthur@kenter.nl of ? elds reserves liquids mbl reserves gas mboe probable development.
Deepwater 568 23590 66072 The total proven and prob-
BAILEY SIMPSON, North America
Shallow water 3214 108537 311216 ably (2P) reserves which (832) 289-5646 • bsimpson@offshore-engineer.com
Ultra-deepwater 330 34353 50041 are deemed recoverable from the reservoir.
TONY STEIN, UK, France & Spain +44 (0)1892 512777 • tony.r.stein@btinternet.com
Woodmac Child Fields
Offshore Onstream &
Under Development Remaining Reserves
CORPORATE STAFF
Water Depth Number Recoverable Recoverable
VLADIMIR BIBIK, IT of ? elds reserves liquids mbl reserves gas mboe bibik@marinelink.com
Onstream and under
Africa 738 29284 30561 development.
Asia 1024 17094 39968
MARK O’MALLEY, PUBLIC RELATIONS
The portion of commercially
Europe 957 19854 24424 omalley@marinelink.com recoverable 2P reserves yet
Latin America & the Caribbean 241 42727 11068 to be recovered from the
Middle East 141 145119 115263
PAUL MORRIS, COMMUNICATIONS reservoir.
North America 6232 25047 4987 pmorris@marinelink.com
Oceania 123 2828 25066
Woodmac Parent Fields
ESTHER ROTHENBERGER, ACCOUNTING
Russia and the Caspian 70 26753 23514 rothenberger@marinelink.com
Source: Wood Mackenzie
KATHLEEN HICKEY, CIRCULATION k.hickey@marinelink.com
JULY/AUGUST 2019 OFFSHORE ENGINEER 5