Page 47: of Offshore Engineer Magazine (Nov/Dec 2019)
Exploration Outlook
Read this page in Pdf, Flash or Html5 edition of Nov/Dec 2019 Offshore Engineer Magazine
The 3,600-metric-ton Generation Module lift was safely completed from SHI’s Quay 7 to the Argos FPU hull located in the offshore ? oating drydock.
Source: BP nOVEMBER/DECEMBER 2019 OFFSHORE ENGINEER 47