Page 24: of Offshore Engineer Magazine (Jan/Feb 2020)

Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2020 Offshore Engineer Magazine

FEATURE Drilling & Completions

Connecting completions

SureCONNECT system subassembly with

Premier feedthrough packer, SureVIEW

CoreBright ? ber, and pressure/temperature gauges being picked up prior to running-in- hole with the lower completion during an install West of Shetland. This marked the world’s ? rst multi-trip completion installation with fullbore ? ber-optic capability.

Source: Baker Hughes 24 OFFSHORE ENGINEER OEDIGITAL.COM

Offshore Engineer