Page 33: of Offshore Engineer Magazine (Nov/Dec 2022)

Read this page in Pdf, Flash or Html5 edition of Nov/Dec 2022 Offshore Engineer Magazine

Using renewable energy to power critical subsea infrastructure needs power management. It’s a capability

Verlume will soon be proving off the Orkney Islands – and Hawaii.

Elaine Maslin takes a look. november/december 2022 OFFSHORE ENGINEER 33

Offshore Engineer