Page 22: of Offshore Engineer Magazine (Nov/Dec 2023)

Read this page in Pdf, Flash or Html5 edition of Nov/Dec 2023 Offshore Engineer Magazine

LEGAL BEAT RENEWABLE ENERGY ©CatHouseProduction/AdobeStock

The Curious Case of the 1,200 MW Transmission Size “Limit” in New England

How the Maximum Contingency of 2,200

MW Was Recast to a 1,200 MW Ceiling

By K&L Gates partners Theodore Paradise, Kimberly Frank, and Ruta Skucas 22 OFFSHORE ENGINEER OEDIGITAL.COM

Offshore Engineer