Page 22: of Offshore Engineer Magazine (Nov/Dec 2023)
Read this page in Pdf, Flash or Html5 edition of Nov/Dec 2023 Offshore Engineer Magazine
LEGAL BEAT RENEWABLE ENERGY ©CatHouseProduction/AdobeStock
The Curious Case of the 1,200 MW Transmission Size “Limit” in New England
How the Maximum Contingency of 2,200
MW Was Recast to a 1,200 MW Ceiling
By K&L Gates partners Theodore Paradise, Kimberly Frank, and Ruta Skucas 22 OFFSHORE ENGINEER OEDIGITAL.COM