Page 42: of Offshore Engineer Magazine (Mar/Apr 2024)

Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2024 Offshore Engineer Magazine

FEATURE DEEP WATER

FLNG Gimi outbound from Singapore.

Images courtesy Vantage Drilling Image courtesy Golar LNG

Tungsten Explorer, 6th Generation Ultradeepwater drillship.

Annual reports from Woodside peg its capital expendi- a newly constructed pipeline – its capacity will be ramped tures on Sangomar at $1 billion in 2021 and $1.034 bil- up to up to 150,000 bbl/day of oil and 200 Mscf/day of lion in 2022 – signifcantly more than half of the company’s gas in mid-decade. Work is beginning on a second FPSO/

CapEx spend during that year. The capital stack buttressing FSO combination at Baleine, with Norwegian subsea spe-

Sangomar (with Woodside holding an 82% stake) has ben- cialist DOF awarded a contract for installation of seabed eftted from a loan of $54 million from the multinational mooring systems and other tasks, including a fowline that infrastructure capital provider Africa Development Bank. will link the FPSO, with the storage tanker.

Italian energy behemoth ENI has been active in off- In Congolese waters, ENI is set to begin production, shore Africa. pegged at 3 million tons/year (tpy) from its Tango FLNG,

In late Summer, 2023, ENI began crude production at with storage aboard the FSU Excalibur The FLNG, previ- its Baleine feld, offshore Ivory Coast (southeast of Abidjan, ously owned by Exmar before its sale to ENI, had previ- using FPSO Baleine , previously named Firenze, originally ously been on charter to YPF in Argentina before a 2023 an Aframax tanker Betatank II, built in 1989, converted at upgrade in Dubai at Drydocks World. Exmar, the Saverys-

Dubai Drydocks World for Saipem and acquired by ENI family controlled owner based in Antwerp, is putting the in 2013). FSU (built in 2002) on 10 year charter to ENI- which says

Initially handling up to 15,000 bbl/day of oil and that a second FLNG is under construction and expected to around 25 Mscf/day of gas – to be delivered onshore by commence production in 2025. 42 OFFSHORE ENGINEER OEDIGITAL.COM

Offshore Engineer