Curtiss Wright Awarded

  • MR Apr-24#23 offshore wind; and the foreign ?  ag Maersk supply WTIV)
    April 2024 - Maritime Reporter and Engineering News page: 23

    offshore wind; and the foreign ? ag Maersk supply WTIV at Seatrium Singapore, together with U.S. ? ag feeder ATBs for transportation and installation of the Empire Wind. Three newbuild SOVs and three conversions/retro? ts were award- ed, too, and 22 CTVs were also announced. The ? rst US rock installa

  • MR Apr-24#22 INTERVIEW 
WE ARE ENGAGED WITH MULTIPLE US 
OSW WIND)
    April 2024 - Maritime Reporter and Engineering News page: 22

    INTERVIEW WE ARE ENGAGED WITH MULTIPLE US OSW WIND DEVELOPMENTS AND SEEING AN UP-TICK FOR CVA, TECHNOLOGY REVIEW AND RISK REDUCTION SERVICES IN EARLY DEVELOPMENT PHASES. WITH NEW LEASE ROUNDS COMING AND NEW OPPORTUNITIES, WE DO NOT SEE A BIG SLOWDOWN FOR OSW DEVELOPMENTS APART FROM THE OBVIOUS

  • MN Apr-24#43 Products
1   2
VETUS Maxwell   In-Mar Solutions
  
3
Furuno)
    April 2024 - Marine News page: 43

    Products 1 2 VETUS Maxwell In-Mar Solutions 3 Furuno ABB 4 for workboat operators encompasses EH Group 1. Heavy Duty 5 three large-sized MFDs with wide, all- Windscreen Wiper glass displays: the 16” TZT16X, 22” Heavy-duty wiper has a thermal cut- TZT22X and 24” TZT24X. Powered out in

  • MR Feb-24#3 When You’re Serious
Pure Radar
The most dependable collision)
    February 2024 - Maritime Reporter and Engineering News page: 3

    When You’re Serious Pure Radar The most dependable collision avoidance in any weather condition... day or night! Award-Winning NXT & X-Class FR10 & FR12 Radar Domes & Open Arrays 10.4” & 12.1” Color LCD Radar Displays Safely navigate high-traffic areas with complete confidence. Target Analyzer™ alerts you

  • MN Feb-24#40 Vessels
HOS Warhorse & HOS Wild Horse 
shipyard construction)
    February 2024 - Marine News page: 40

    Vessels HOS Warhorse & HOS Wild Horse shipyard construction contracts were wrongfully termi- nated. Gulf Island and Hornbeck settled in October 2023, clearing way for the builds to be completed by another yard. Eastern secured the contract to complete the builds from Zurich American Insurance Company

  • MN Feb-24#39 Vessels
Next WSF Vessels Could Be Built 
Outside of)
    February 2024 - Marine News page: 39

    Vessels Next WSF Vessels Could Be Built Outside of Washington State By Eric Haun The next newbuilds for Washington State Ferries (WSF) is required to award a credit of 13% of the bid price for bid could be built by a shipyard outside of Washington as the proposals for vessels constructed in the state of

  • MN Feb-24#21 Column
Washington Watch
2 project had also been terminated.)
    February 2024 - Marine News page: 21

    Column Washington Watch 2 project had also been terminated. Notwithstanding the rather Equinor and BP will look to recompete for a new contract’s termination, GLDD’s Jones Act-compliant Sub- NYSERDA OREC Agreement in 2024 (of course, with a sea Rock Installation Vessel (SRIV) remains under con- substantial

  • MN Feb-24#17 Column
Going Green
ernize ferry operations, replace aging)
    February 2024 - Marine News page: 17

    Column Going Green ernize ferry operations, replace aging implemented to address grid and space increased power requirements. That vessels, and upgrade ferry terminals. constraints with electri? cation. can involve installing new conduit, The grants are critical to helping WETA is one of many U.S.

  • MN Feb-24#16 Column   
Going Green
For Ferries to Go Green, Governments)
    February 2024 - Marine News page: 16

    Column Going Green For Ferries to Go Green, Governments Will Need to Provide the Green By Kaiya Levine, Energy & Sustainability Consultant, Arup Whether it is from international organizations ? ve nautical miles or less, meaning they have relatively low or state government agencies, there is growing

  • MN Feb-24#8 By the
Numbers
© Dragon Claws / Adobe Stock 
Rebuilding)
    February 2024 - Marine News page: 8

    By the Numbers © Dragon Claws / Adobe Stock Rebuilding the Foundations of US Offshore Wind By Philip Lewis, Director of Research, Intelatus Global Partners As we enter a New Year, the memories of the shocks to with a potential of 3.3-6.3 GW in Delaware and Chesa- the foundations to the U.S. offshore wind

  • MT Jan-24#57 DEEP DIVE Podcast Debuts 
In episode one of the DEEP DIVE)
    January 2024 - Marine Technology Reporter page: 57

    DEEP DIVE Podcast Debuts In episode one of the DEEP DIVE podcast, host Rhonda Moniz Meet the Host hosts Dan Shropshire, Vice President Business Development and Rhonda J. Moniz is an ac- Program Execution at Teledyne Marine Vehicles & Emily Shum- complished underwater chenia, Director - Regional Wildlife

  • MT Jan-24#46 ROVS
Omega Subsea 
Robotics ordered 
six complete ROV)
    January 2024 - Marine Technology Reporter page: 46

    ROVS Omega Subsea Robotics ordered six complete ROV systems from Kystdesign. Image courtesy SMD DEME’s upcoming subsea rock installation vessel Yellow- structor ROV systems and two brand new compact Construc- stone, scheduled to join the ? eet in the ? rst half of 2024. tor ROV systems. The systems

  • MT Jan-24#28 SUBSEA VEHICLES DEFENSE
Knife? sh is a medium-class 
mine)
    January 2024 - Marine Technology Reporter page: 28

    SUBSEA VEHICLES DEFENSE Knife? sh is a medium-class mine countermeasure UUV designed for deployment off the Littoral Combat Ship. U.S. Navy photo by Mass Communication Specialist 1st Class Brian M. Brooks/RELEASED be applied to Orca XLUUV 1 through 5, which will be built (encapsulated torpedo) mine.

  • MT Jan-24#22 INTERVIEW DUANE FOTHERINGHAM, HII MISSION TECHNOLOGIES
Image)
    January 2024 - Marine Technology Reporter page: 22

    INTERVIEW DUANE FOTHERINGHAM, HII MISSION TECHNOLOGIES Image courtesy HII REMUS 620 Last month we visited with Duane Fotheringham, President, Unmanned Systems, HII Mission Technologies division, for insights on the new REMUS 620. Can you summarize the key techni- for the U.S. Navy’s Lion? sh System cal

  • MR Jan-24#40 In the Shipyard
Latest Deliveries, Contracts and Designs
Var)
    January 2024 - Maritime Reporter and Engineering News page: 40

    In the Shipyard Latest Deliveries, Contracts and Designs Vard Inks $450M to Build Cable Layers ARD won a $252m contract for the design and con- struction of a third cable laying vessel for Italy’s Prysmian Group: Monna Lisa is still under construc- V tion; Leonardo da Vinci was delivered in 2021. The new

  • MR Jan-24#3 When You’re Serious
Pure Radar
The most dependable collision)
    January 2024 - Maritime Reporter and Engineering News page: 3

    When You’re Serious Pure Radar The most dependable collision avoidance in any weather condition... day or night! Award-Winning NXT & X-Class FR10 & FR12 Radar Domes & Open Arrays 10.4” & 12.1” Color LCD Radar Displays Safely navigate high-traffic areas with complete confidence. Target Analyzer™ alerts you

  • MT Nov-23#30 SONAR TECHNOLOGIES  DAWN MASSA STANCAVISH, MASSA
GENERATIONS)
    November 2023 - Marine Technology Reporter page: 30

    SONAR TECHNOLOGIES DAWN MASSA STANCAVISH, MASSA GENERATIONS OF INNOVATION IN SONAR & ULTRASONIC TECHNOLOGY Massa Products Corporation designs and manufactures sonar and ultrasonic products for use in ocean, air and ? uids. A long- tenured innovator in the subsea space, Massa is the “eyes and ears

  • MR Dec-23#3 When You’re Serious
Pure Radar
The most dependable collision)
    December 2023 - Maritime Reporter and Engineering News page: 3

    When You’re Serious Pure Radar The most dependable collision avoidance in any weather condition... day or night! Award-Winning NXT & X-Class FR10 & FR12 Radar Domes & Open Arrays 10.4” & 12.1” Color LCD Radar Displays Safely navigate high-traffic areas with complete confidence. Target Analyzer™ alerts you

  • MN Nov-23#58 People &
Companies
employee Jason Powers from direc-
Mueller)
    November 2023 - Marine News page: 58

    People & Companies employee Jason Powers from direc- Mueller Elected Next tor of business development to chief SNAME President NETSCo president and CEO operating of? cer. Richard Mueller has been elected Stoik Joins Ascot US to become the next president of the Bukoski Mueller Peakes Pat Stoik has

  • MN Nov-23#45 the construction of the vessel.” switchboards and dual)
    November 2023 - Marine News page: 45

    the construction of the vessel.” switchboards and dual propulsion motors. This Congressional direction led to a MARAD Vessel Power onboard consists of Wabtec Corporation’s Construction Manager (VCM) contract award to TOTE 16V250MDC, EPA Tier 4, IMO Tier III marine diesel Services in 2019, leveraging

  • MN Nov-23#40 Feature
Shipyards 
TOTE
“It took some time to get [the)
    November 2023 - Marine News page: 40

    Feature Shipyards TOTE “It took some time to get [the VCM process] right,” he added, “but the demand for success was important. All parties stayed in their lanes. This was make or break for industry.” – Ben Christian, VP for Business Development and New Construction, TOTE Services ed, “but the

  • MN Nov-23#39 ‘Vessel Construction Manager (VCM)’
When asked about new)
    November 2023 - Marine News page: 39

    ‘Vessel Construction Manager (VCM)’ When asked about new industry trends and develop- ments Paxton and Zorensky quickly referenced delivery, in September, of Philly Shipyard’s Empire State, the new purpose-built training vessel for the SUNY Maritime Col- lege, the ? rst of a number of such vessels to be

  • MN Nov-23#8 By the
Numbers
Dredge Construction 
Booming in 
Competitive)
    November 2023 - Marine News page: 8

    By the Numbers Dredge Construction Booming in Competitive US Market A dredge building boom that has been underway in the 408% in value since 1993. In these 30 years the subset United States for several years is still going strong as the of hopper dredging contract awards has increased 620%, market

  • MR Nov-23#58 PORT FUNDING
The ports authority found success by tailoring)
    November 2023 - Maritime Reporter and Engineering News page: 58

    PORT FUNDING The ports authority found success by tailoring its projects to city has already submitted one Port Infrastructure Develop- the requirements of the grants programs. For example, for the ment Program grant and is positioned for other prospects to Colonel's Island Terminal needed to increase