Page 42: of Marine Technology Magazine (Sep/Oct 2015)
Ocean Observation: Gliders, Buoys & Sub-Surface Networks
Read this page in Pdf, Flash or Html5 edition of Sep/Oct 2015 Marine Technology Magazine
Subsea Construction
DSV Constructor working on site
Jakob Knudsen, DABRAT project manager, Maersk Oil, pieces of up to 4-5-tonne sections of fabricated steel through says: “Had nothing been done, the platform’s life would have slots in the platform’s structure, guided by divers. been shortened.” The

41

43