Page 20: of Maritime Reporter Magazine (April 15, 1971)
Read this page in Pdf, Flash or Html5 edition of April 15, 1971 Maritime Reporter Magazine
More than 130 ships have lower operating costs with the V2M-8 boiler.
Because the simple, symmetrical, clean design of the V2M-8 means fewer slipped schedules, reduced maintenance costs, and minimum boiler downtime.
Since 1962, more than 240 of these latest-design C-E boilers have proved their high availability and have lowered operating costs for merchant and naval ships alike. Worldwide.
Check the features that provide trouble-free operation and that make the V2M-8 the most reli- able marine boiler available.
For more details, write C-E
Marine Division, Combustion
Engineering, Inc., Windsor,
Conn. 06095. We'll give you the whole story.
C MARINE DIVISION
COMBUSTION ENGINEERING. INC. 22 Maritime Reporter/Engineering News