Page 4th Cover: of Maritime Reporter Magazine (July 15, 1973)

Read this page in Pdf, Flash or Html5 edition of July 15, 1973 Maritime Reporter Magazine

More than 130 ships have lower operating costs with theV2M-8 boiler.

Because the simple, symmetrical, clean design of the V2M-8 means fewer slipped schedules, reduced maintenance costs, and minimum boiler downtime.

Since 1962, more than 240 of these latest-design C-E boilers have proved their high availability and have lowered operating costs for merchant and naval ships alike. Worldwide.

Check the features that provide trouble-free operation and that make the V2M-8 the most reli- able marine boiler available.

For more details, write C-E

Marine Division, Combustion

Engineering, Inc., Windsor,

Conn. 06095. We'll give you the whole story.

C MARINE DIVISION

COMBUSTION ENGINEERING. INC. 14 Maritime Reporter/Engineering News

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.